Phase I Mangrove Restoration Project in the Kingdom of Saudi Arabia

ICR-388 ↗

#3of 11 in Blue carbon#2of 7 in SA#25of 154 in Intl. Carbon Registry (ICR)#4of 14 in AR-AM0014

5.2/ 10
Integrity
5.2
Transparency
5.0
Claim Safety
6.0
Documentation
4.5

Audit Analysis

A 45-year mangrove restoration project in Saudi Arabia with VVB-confirmed additionality and a 12% buffer pool, but undermined by a project-specific baseline, contradictory leakage justifications across documents, unaddressed reversal risk per the validation report, and a very low first-period delivery (~4% of pro-rata expectation). The project is conservative in its actual crediting relative to its lifetime estimate, reducing over-crediting risk, but documentation quality and safeguards (notably the absence of FPIC) remain weak.

Red Flags

  • Reversal events marked as 'not addressed' in the validation report, contradicting the PDD's claim of 'none reported' — permanence risk for mangroves (storms, disease, sea-level rise) is not robustly quantified
  • Leakage justification is contradictory: the monitoring report states it was 'quantified' while the validation report says it was 'deemed negligible,' yet the deduction is 0% in both cases
  • Free, Prior and Informed Consent (FPIC) was not conducted for a project operating in three coastal communities (Safaniya, Jazan, Yanbu)
  • 26 Clarification Requests and 4 Corrective Action Requests were raised during verification, indicating substantial initial documentation deficiencies
  • Low extraction confidence across the document set limits the reliability of the structured data used for this assessment

Credit Vintages

IssuedRetiredAvailable
2022
80080
2023
2,88202,882
2024
12,771012,771
2025
14,723014,723
2026
16,736016,736
2027
18,814018,814
2028
20,961020,961
2029
23,180023,180
2030
25,474025,474
2031
27,846027,846
2032
30,300030,300
2033
32,838032,838
2034
35,461035,461
2035
38,173038,173
2036
40,974040,974
2037
43,864043,864
2038
46,844046,844
2039
49,913049,913
2040
53,068053,068
2041
56,308056,308
2042
59,629059,629
2043
63,026063,026
2044
66,494066,494
2045
70,026070,026
2046
73,615073,615
2047
77,254077,254
2048
80,932080,932
2049
84,642084,642
2050
88,371088,371
2051
92,112092,112
2052
95,852095,852
2053
99,582099,582
2054
103,2920103,292
2055
106,9700106,970
2056
110,6090110,609
2057
114,1980114,198
2058
117,7300117,730
2059
121,1980121,198
2060
124,5950124,595
2061
127,9160127,916
2062
131,1560131,156
2063
134,3110134,311
2064
137,3800137,380
2065
140,3600140,360
2066
108,3260108,326
Total3,120,78603,120,786

Risk Indicators

Additionality

VVB-confirmed but initial evidence was weak (4 CARs resolved)

Permanence

12% buffer pool present; reversal risk 'not addressed' per validation report

Leakage

0% deduction with contradictory justification across documents

Baseline

Project-specific baseline; reassessment timing not stated

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status both not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08AR-AM0014

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents