Pingjiang County Domestic Waste Harmless Landfill Site LFG Utilization Project

VCS-5214 ↗

#585of 1084 in China#667of 1339 in Verra (VCS)#52of 159 in ACM0001

5.1/ 10
Integrity
5.0
Transparency
5.5
Claim Safety
5.0
Documentation
5.0

Audit Analysis

A VCS-registered landfill gas capture project (ACM0001) in China with a VVB-confirmed combined additionality test and matching claimed/verified ERR of 78,131 tCO₂e for the first monitoring period. However, five material findings, six corrective actions, and five inter-document contradictions—particularly on whether gas capture is legally required and on the leakage justification—undermine confidence in the additionality and leakage claims. The absence of a stated buffer pool and the 0% leakage deduction in a project type where gas escape is a realistic risk leave meaningful permanence and leakage concerns unaddressed.

Red Flags

  • Contradiction on capture_legally_required: the PDD (Aug 2024) states capture is legally required, while the monitoring report (Aug 2024) states it is not—directly undermining the additionality claim if the PDD is correct.
  • Five material findings in the verification report, including inconsistent project start date, parameter η_PJ sourced from the FSR rather than methodology defaults, and an insufficient ex-ante/ex-post comparison in Section 5.4.
  • Leakage deduction of 0% with a 'deemed negligible' justification in the monitoring report, yet the validation report records leakage as 'not addressed'—a direct contradiction in a project type where uncaptured LFG is a realistic emission pathway.
  • CORSIA eligibility and CCP status are both not stated in any available document, leaving dual-channel risk unassessed.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed but capture-legality contradiction

Permanence

LFG reversal risk unquantified

Leakage

0% deduction; justification contradicted across documents

Baseline

Project-specific, measured; reassessment not yet due

Safeguards

FPIC conducted; grievance mechanism in place

Double-claim

CORSIA and CCP status both not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents