Skip to main content
CCLand use (AFOLU)ColombiaGeneral Methodologyv2.1

Planeta Agradecido con el Resguardo indígena Bajo Río Guainía y Río Negro II

ECO-146 ↗

#94of 145 in REDD+#92of 124 in Colombia#68of 99 in CerCarbono (CC)

4.6/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
5.0
Documentation
5.0

Audit Analysis

This REDD+ project in Colombia's Guainía region has the structural elements of a credible carbon project—VVB-verified additionality, a jurisdictional baseline, a 5% buffer pool, and no reported reversals—but is undermined by an unusually high volume of material findings (22+), a missed ex-ante deforestation reduction target (32% achieved vs. 83% expected), a double-counting concern between projects of the same owner, and significant contradictions across verification documents. The project delivered roughly 31% of the pro-rata ex-ante expectation for the 2022 monitoring period, which is conservative but raises questions about baseline accuracy.

Red Flags

  • Project achieved only 32% of its ex-ante deforestation reduction target (83% expected) in 2022, with 402 ha of deforestation (89% attributed to natural wind events)
  • Hallazgo 19 identifies possible double counting in the leakage area between projects of the same project owner
  • Buffer pool percentage contradicts across documents: 5% in the September 2024 verification report vs. 12.2% in the June 2024 monitoring report
  • Total ERR claimed differs by nearly 100× between the validation report (14.9 million tCO2e) and the July 2024 verification report (150,176 tCO2e), creating serious data reliability concerns
  • Project not registered in RENARE (Colombia's national REDD+ registry) due to platform maintenance, and prior consultation evidence before the Ministry of Interior is missing

Credit Vintages

IssuedRetiredAvailable
2022
3,54903,549
Total3,54903,549

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

5% buffer, no reversals, but 402 ha windthrow loss

Leakage

Quantified but deduction % not stated; double-counting concern

Baseline

Jurisdictional baseline, reassessed 2022

Safeguards

FPIC and grievance mechanism present, but prior consultation evidence incomplete

Double-claim

CORSIA and CCP status not stated; same-owner overlap flagged

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents