Plotkin Farm
#793of 1329 in Industrial#47of 154 in Intl. Carbon Registry (ICR)#32of 43 in AMS-III.F
Audit Analysis
The Emek Hefer Compost project (ICR-44, Israel) is a composting avoidance project with VVB-verified additionality and no reported reversals, but it carries significant quality concerns: a 0% buffer pool, a project-specific baseline with no documented reassessment, contradictory leakage justifications across documents, and 24 material findings with 24 corrective actions. The verified ERR (414,107) exceeds the ex-ante lifetime estimate (367,730), indicating the project over-delivered, but the documentation quality and baseline robustness limit confidence in the credit claims.
Red Flags
- 24 material findings and 24 corrective actions identified in the verification report, including substantive issues such as inconsistent GHG reduction figures, methane emission source misclassification in the baseline, and project boundary errors
- Leakage justification is contradictory: the validation report (2025-07-30) states 'deemed negligible' while the PDD (2025-07-29) states 'quantified', and the deduction is 0%
- Project-specific baseline with no documented reassessment date, reducing confidence in baseline robustness over the 10-year crediting period
- FPIC was not conducted despite the project's location in Israel and its community-facing composting operations
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 36,773 | 0 | 36,773 | |
| 2014 | 36,773 | 0 | 36,773 | |
| 2015 | 36,773 | 0 | 36,773 | |
| 2016 | 36,773 | 0 | 36,773 | |
| 2017 | 36,773 | 0 | 36,773 | |
| 2018 | 36,773 | 0 | 36,773 | |
| 2019 | 36,773 | 0 | 36,773 | |
| 2020 | 36,773 | 0 | 36,773 | |
| 2021 | 36,773 | 0 | 36,773 | |
| 2022 | 36,773 | 0 | 36,773 | |
| Total | 367,730 | 0 | 367,730 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, contradictory justification
Project-specific, no reassessment date
Grievance present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →