Proyecto Carbono CAS
Score Breakdown
Integrity
verified The monitoring report (2023-06-22) reports no reversal events and the project applies a 15% buffer pool.
missing The baseline method and reassessment timing were not found in the extracted record, and leakage is not quantified beyond being described as negligible in the monitoring report (2023-06-22).
Transparency
verified A named VVB (ICONTEC) is identified and the monitoring period is clearly stated (2017-11-30 to 2022-09-14) in the monitoring report (2023-06-22).
missing Total claimed and verified removals/ERR values were not found in the extracted record, reducing traceability of results.
Claim Safety
verified The project is explicitly not CORSIA-eligible in the extracted record, reducing aviation-claim channel risk.
missing Missing baseline and quantified leakage treatment, plus contradictions on safeguards-related claims between validation and monitoring reports, increase over-crediting and greenwashing risk.
Documentation
verified Three core documents are available (PDD, validation report, monitoring report) with high extraction confidence.
missing Contradictions between the validation report (2023-06-14) and monitoring report (2023-06-22) on safeguards/FPIC/grievance/benefit-sharing reduce reliability of the documentation set.
Detailed Analysis
Integrity
The monitoring report (2023-06-22) indicates a 15% buffer pool and reports no reversal events, which supports permanence management for a removal project. Additionality is stated as confirmed by the VVB in the extracted record, but the type of additionality test is not found, limiting robustness. The baseline method and the date of any baseline reassessment were not found in the extracted record, which is a major integrity gap for quantifying removals. Leakage is described as negligible in the monitoring report (2023-06-22), but no leakage deduction percentage is provided in the extracted record.
Transparency
The monitoring period is clearly defined (2017-11-30 to 2022-09-14) in the monitoring report (2023-06-22), and the VVB is identified as ICONTEC. However, total claimed and total verified removals/ERR values were not found in the extracted record, preventing an external reader from reconciling issuance quantities to monitoring outcomes. The registry is listed only as "other" and CCP status was not found in the extracted record, limiting completeness for third-party checks.
Claim Safety
CORSIA eligibility is explicitly false in the extracted record, which reduces the risk of aviation-aligned claims. At the same time, the baseline approach is not found in the extracted record and leakage is not quantified beyond being deemed negligible in the monitoring report (2023-06-22), both of which elevate over-crediting risk. Contradictions between the validation and monitoring reports on FPIC, grievance mechanism, benefit sharing, and safeguards increase reputational risk because social claims may be overstated or inconsistently evidenced.
Documentation
The document set includes a PDD, a validation report (2023-06-14), and a monitoring report (2023-06-22), and extraction confidence is high, supporting basic documentation completeness. No material findings or corrective actions are reported in the extracted record, which is positive but should be interpreted cautiously given other gaps. The crediting period is long (2008-11-30 to 2028-11-28) relative to the monitoring period provided, and key quantitative outputs (total ERR) are not found in the extracted record, reducing practical usability of the documentation.
Overall
Key integrity elements are present (VVB involvement, buffer pool, and no reversals reported), but missing baseline and quantified leakage treatment constrain confidence in the credited removals. For contradictions, the monitoring report (2023-06-22) was privileged over the validation report (2023-06-14) for reversal and leakage statements because it is later and reflects monitored implementation; this supports using "no reversals reported" and "leakage deemed negligible" while still penalizing the lack of quantification. For safeguards, FPIC, grievance mechanism, and benefit-sharing, the contradiction is material: the validation report indicates these are present while the later monitoring report indicates they are not; the later monitoring report was privileged as the more current operational account, and scores were reduced due to the inconsistency itself. Note: gate rules may apply post-scoring if integrity or documentation fall below thresholds.
Audit Analysis
The project shows some core integrity elements (VVB involvement and a stated buffer pool with no reversals reported), but key quantification and baseline details are missing from the extracted record. Multiple inconsistencies between the validation and monitoring reports on safeguards and social process claims reduce confidence and increase reputational/greenwashing risk.
Project Description
CAS Carbon Project located in the northeast of Antioquia in the municipalities of Amalfi, Caracolí, Maceo, San Roque, Vegachí, Yolombó and Yalí (Antioquia), Colombia, currently has 7,833.54 ha of eligible plantation area of the species Pinus tecunumanii, which aims to capture carbon dioxide from the atmosphere for 20 years. In the present monitoring period (30.11.2017 to 14.09.2022), the verification of 573,274 tons of CO2e captured in the entire plantation area, which consists of 7,006.69 ha validated in 2018 in which plantations were established between 2008 and 2017, is carried out; additionally, the validation and verification of 826. 84 ha of plantation established during 2018 in eligible areas in the municipalities of Amalfi, Maceo, Yalí and Yolombó, as contemplated in the project design (section 2.7 of the PDD) validated in 2018.
Red Flags
- Baseline approach and any baseline reassessment timing were not found in the extracted record, limiting confidence in removal additionality and crediting robustness.
- Leakage is only described as negligible, with no leakage deduction percentage stated in the extracted record.
- Safeguards, FPIC, grievance mechanism, and benefit-sharing are contradictory between the validation report (claims present) and the monitoring report (claims absent).
- No verified or claimed total removals/ERR figures were found in the extracted record, limiting auditability of outcomes.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 1,829 | 0 | 1,829 | |
| 2019 | 3,648 | 0 | 3,648 | |
| 2020 | 3,647 | 0 | 3,647 | |
| 2021 | 42,337 | 0 | 42,337 | |
| 2022 | 34,529 | 0 | 34,529 | |
| Total | 85,990 | 0 | 85,990 |
Cosa migliorerebbe questo punteggio
- Disclose the baseline method and any baseline reassessment schedule in the public documentation, and clearly link it to quantified removal calculations.
- Provide quantified leakage assessment (including an explicit leakage deduction percentage or a documented calculation supporting 0%) and reconcile safeguards/FPIC/grievance/benefit-sharing statements consistently across validation and monitoring reports.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed, but test type not evidenced
15% buffer pool; no reversals reported
Deemed negligible, not quantified
Baseline method not found
Safeguards/FPIC/grievance claims inconsistent
Not CORSIA-eligible
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →