Proyecto de captura y aprovechamiento del biogás generado en el Complejo Ambiental Las Iguanas
#69of 268 in Biogas#41of 99 in CerCarbono (CC)
Audit Analysis
A biogas capture project at a municipal waste facility in Ecuador with VVB-verified additionality and a measured project-specific baseline, but undermined by the absence of any buffer pool, four material findings with two outstanding corrective actions, a 0% leakage deduction whose justification is contradicted across documents, and a low extraction confidence rating that limits assurance in the underlying data. The project delivered roughly 60% of its pro-rata ex-ante expectation for the elapsed monitoring period, which is within a plausible range for a biogas operation but warrants scrutiny.
Red Flags
- No buffer pool or permanence mechanism is stated for a 10-year crediting period, leaving reversal risk unaddressed
- Four material findings reported in the monitoring report, including torch temperature monitoring not described in the PDD and safeguards format deficiencies, with two corrective actions still outstanding
- FPIC was not conducted despite the project operating at a public waste facility with community stakeholders
- Low extraction confidence across the document set reduces reliability of all extracted figures
- Grid emission factor differs by 32% between the PDD (0.2441) and the validation report (0.323), directly affecting the magnitude of claimed reductions
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 0 | 0 | 0 | |
| 2022 | 0 | 0 | 0 | |
| 2023 | 226,882 | 0 | 226,882 | |
| 2024 | 195,201 | 0 | 195,201 | |
| Total | 422,083 | 0 | 422,083 |
Risk Indicators
VVB-confirmed investment test
reversal risk unaddressed
0% deduction; justification contradicted across documents
Project-specific measured baseline; no reassessment date stated
Grievance mechanism present; FPIC not conducted; formats outdated
Not CORSIA-eligible; no dual-channel risk identified
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →