Vai al contenuto principale
GS Energy Efficiency - Domestic Honduras Documentazione completa General Methodology v2.0

*Proyecto Mirador enhanced distribution of efficient woodstoves

GS-1574 ↗

4.8 / 10
Integrity
5.2
Transparency
4.6
Claim Safety
4.8
Documentation
4.1

Score Breakdown

Integrity

verified The verification report confirms additionality through a combined test and says the VVB, DNV Climate Change Services AS, verified it.

missing The baseline is project-specific and last reassessed in 2010, while reversal events are not addressed and no buffer pool share is stated.

Transparency

verified The monitoring period is stated, the VVB is named, and the monitoring report and verification report provide some traceable MRV detail.

missing Multiple contradictions reduce trust in the record, and the extracted data do not include claimed versus verified ERR totals.

Claim Safety

verified Leakage was quantified with a 2% deduction, which is better than leaving leakage unaddressed.

missing The project uses a project baseline rather than a more standardized recent baseline, and the record shows conflicting FNRB and usage-monitoring values across documents.

Documentation

verified The record includes several official document types, with 10 documents used and medium extraction confidence.

missing The verification report lists many material findings, and the extracted record does not show a clear, recent, fully consistent documentation set.

Detailed Analysis

Integrity

The verification report confirms additionality through a combined test and states that DNV Climate Change Services AS verified it, which supports the project’s core environmental claim. On the other hand, the baseline method is project-specific and was last reassessed in 2010, and reversal events are not clearly addressed in the extracted record. No buffer pool percentage is available, so permanence protection cannot be credited strongly.

Transparency

The monitoring period is stated and the VVB is identified, which helps traceability. Still, the extracted record does not provide claimed versus verified ERR totals, and the monitoring and verification documents disagree on several operational details. That weakens confidence in the public MRV trail even though some core information is present.

Claim Safety

Leakage was quantified with a 2% deduction, which is a positive sign for over-crediting control. However, the project relies on a project baseline rather than a recent standardized reassessment, and the record contains conflicting values for FNRB, usage monitoring, leakage treatment, reversal handling, and the crediting period. Because the project is marked CORSIA-eligible and CCP status is not mentioned, dual-claim risk is not eliminated.

Documentation

The extracted record draws on multiple official documents, including a verification report, a monitoring report, and a PDD, with 10 documents used overall. Medium extraction confidence is acceptable but not ideal, and the verification report lists many material findings. The documentation is therefore usable but not especially clean or complete.

Overall

The project is moderately credible but not high confidence because the evidence base contains several contradictions that affect leakage, FNRB, usage monitoring, reversal handling, and the crediting period. Where conflicts exist, I privileged the more recent verification report for leakage, FNRB, and usage monitoring because it is later than the older monitoring or verification entries, but that choice still leaves reliability concerns. The project’s additionality and leakage treatment are positive, yet the lack of clear permanence safeguards and the CORSIA-eligible status keep claim safety only mid-range.

Audit Analysis

The project has some strengths: additionality was confirmed by the VVB, FPIC and grievance mechanisms are documented, and leakage was quantified with a 2% deduction. However, there are several reliability concerns, including multiple document contradictions, a project-specific baseline, and reversal risk that is not clearly resolved in the extracted record.

Project Description

Developer: Proyecto Mirador Type: Energy Efficiency - Domestic Size: Small Scale Methodology: GS TPDDTEC v 2. Crediting period: 2009-05-01 → 2019-04-30 Estimated annual credits: 38149 tCO2e SDGs: Goal 8: Decent Work and Economic Growth, Goal 3: Good Health and Well-Being, Goal 13: Climate Action, Goal 15: Life On Land, Goal 2: Zero Hunger, Goal 16: Peace, Justice and Strong Institutions, Goal 12: Responsible Production and Consumption, Goal 5: Gender Equality, Goal 4: Quality Education, Goal 7: Affordable and Clean Energy, Goal 1: No Poverty

Red Flags

  • Several key figures conflict across documents, including leakage treatment, FNRB, usage monitoring method, reversal handling, and crediting period.
  • Reversal events are not clearly addressed in the extracted record, and no buffer pool percentage is available.

Credit Vintages

Issued Retired Available
2009
1,921 1,921 0
2010
11,942 11,458 484
2011
31,422 31,422 0
2012
81,991 81,991 0
2013
121,255 116,090 5,165
Total 248,531 242,882 5,649

Cosa migliorerebbe questo punteggio

  • Publish a reconciled monitoring package that explains the conflicting FNRB, leakage, usage monitoring, reversal, and crediting-period values.
  • Provide a clear permanence treatment, including reversal management and any buffer pool allocation, plus claimed-versus-verified ERR totals.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

reversal risk not clearly resolved

Leakage

2% quantified deduction

Baseline

project baseline, old reassessment

Safeguards

FPIC and grievance mechanism present

Double-claim

CORSIA-eligible; CCP status not mentioned

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-17 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti