*Proyecto Mirador enhanced distribution of efficient woodstoves
Score Breakdown
Integrity
verified The verification report confirms additionality through a combined test and says the VVB, DNV Climate Change Services AS, verified it.
missing The baseline is project-specific and last reassessed in 2010, while reversal events are not addressed and no buffer pool share is stated.
Transparency
verified The monitoring period is stated, the VVB is named, and the monitoring report and verification report provide some traceable MRV detail.
missing Multiple contradictions reduce trust in the record, and the extracted data do not include claimed versus verified ERR totals.
Claim Safety
verified Leakage was quantified with a 2% deduction, which is better than leaving leakage unaddressed.
missing The project uses a project baseline rather than a more standardized recent baseline, and the record shows conflicting FNRB and usage-monitoring values across documents.
Documentation
verified The record includes several official document types, with 10 documents used and medium extraction confidence.
missing The verification report lists many material findings, and the extracted record does not show a clear, recent, fully consistent documentation set.
Detailed Analysis
Integrity
The verification report confirms additionality through a combined test and states that DNV Climate Change Services AS verified it, which supports the project’s core environmental claim. On the other hand, the baseline method is project-specific and was last reassessed in 2010, and reversal events are not clearly addressed in the extracted record. No buffer pool percentage is available, so permanence protection cannot be credited strongly.
Transparency
The monitoring period is stated and the VVB is identified, which helps traceability. Still, the extracted record does not provide claimed versus verified ERR totals, and the monitoring and verification documents disagree on several operational details. That weakens confidence in the public MRV trail even though some core information is present.
Claim Safety
Leakage was quantified with a 2% deduction, which is a positive sign for over-crediting control. However, the project relies on a project baseline rather than a recent standardized reassessment, and the record contains conflicting values for FNRB, usage monitoring, leakage treatment, reversal handling, and the crediting period. Because the project is marked CORSIA-eligible and CCP status is not mentioned, dual-claim risk is not eliminated.
Documentation
The extracted record draws on multiple official documents, including a verification report, a monitoring report, and a PDD, with 10 documents used overall. Medium extraction confidence is acceptable but not ideal, and the verification report lists many material findings. The documentation is therefore usable but not especially clean or complete.
Overall
The project is moderately credible but not high confidence because the evidence base contains several contradictions that affect leakage, FNRB, usage monitoring, reversal handling, and the crediting period. Where conflicts exist, I privileged the more recent verification report for leakage, FNRB, and usage monitoring because it is later than the older monitoring or verification entries, but that choice still leaves reliability concerns. The project’s additionality and leakage treatment are positive, yet the lack of clear permanence safeguards and the CORSIA-eligible status keep claim safety only mid-range.
Audit Analysis
The project has some strengths: additionality was confirmed by the VVB, FPIC and grievance mechanisms are documented, and leakage was quantified with a 2% deduction. However, there are several reliability concerns, including multiple document contradictions, a project-specific baseline, and reversal risk that is not clearly resolved in the extracted record.
Project Description
Developer: Proyecto Mirador Type: Energy Efficiency - Domestic Size: Small Scale Methodology: GS TPDDTEC v 2. Crediting period: 2009-05-01 → 2019-04-30 Estimated annual credits: 38149 tCO2e SDGs: Goal 8: Decent Work and Economic Growth, Goal 3: Good Health and Well-Being, Goal 13: Climate Action, Goal 15: Life On Land, Goal 2: Zero Hunger, Goal 16: Peace, Justice and Strong Institutions, Goal 12: Responsible Production and Consumption, Goal 5: Gender Equality, Goal 4: Quality Education, Goal 7: Affordable and Clean Energy, Goal 1: No Poverty
Red Flags
- Several key figures conflict across documents, including leakage treatment, FNRB, usage monitoring method, reversal handling, and crediting period.
- Reversal events are not clearly addressed in the extracted record, and no buffer pool percentage is available.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 1,921 | 1,921 | 0 | |
| 2010 | 11,942 | 11,458 | 484 | |
| 2011 | 31,422 | 31,422 | 0 | |
| 2012 | 81,991 | 81,991 | 0 | |
| 2013 | 121,255 | 116,090 | 5,165 | |
| Total | 248,531 | 242,882 | 5,649 |
Cosa migliorerebbe questo punteggio
- Publish a reconciled monitoring package that explains the conflicting FNRB, leakage, usage monitoring, reversal, and crediting-period values.
- Provide a clear permanence treatment, including reversal management and any buffer pool allocation, plus claimed-versus-verified ERR totals.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed combined test
reversal risk not clearly resolved
2% quantified deduction
project baseline, old reassessment
FPIC and grievance mechanism present
CORSIA-eligible; CCP status not mentioned
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- Monitoring Report_9th monitoring period_01-12-17 to 30-11-18_v3.0.pdf
- (1)Monitoring Report_3rd monitoring period_01-12-11 to 30-11-12_v4.0.pdf
- Monitoring Report_2nd monitoring period_01-12-10 to 30-11-11_v3.0.pdf
- (1)Monitoring Report_1st monitoring period_01-05-09 to 30-11-10_v3.0.pdf
- (1)Monitoring Report_4th monitoring period_01-12-12 to 30-11-13_v3.0.pdf
Other
pdd
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →