Proyecto Mirador Enhanced Distribution of Improved Cookstove in Latin America – Fourth VPA for Distribution of Dos por Tres Cookstove in Honduras
GS-4930 ↗ · current registry ID: GS12798
#555of 1329 in Industrial#8of 20 in Honduras#867of 1801 in Gold Standard (GS)
Audit Analysis
Proyecto Mirador's fourth VPA for improved cookstove distribution in Honduras is a Gold Standard-registered project with VVB-confirmed additionality and quantified leakage, but is undermined by a 43% gap between claimed and verified emissions reductions, numerous material findings (13) and corrective actions (14) flagged by the verifier, and the absence of a documented buffer pool or permanence mechanism. The project-specific baseline and multiple cross-document contradictions reduce confidence in the underlying data.
Red Flags
- Verified ERR (5,751 tCO2e) is only 57% of the claimed ERR (10,139 tCO2e) for the same monitoring period, indicating a 43% over-claiming gap
- 13 material findings and 14 corrective actions identified by the VVB, including baseline scenario misalignment with methodology sections 3.4/3.5 and a common practice analysis lacking the required CDM TOOL24 step approach
- FNRB value contradiction: 0.33 (2026 verification report) vs 69 (2019 verification report) — units or basis unclear
- Leakage deduction inconsistent across periods: 4.7% (2019 VR) vs 1.8% (2026 MR) without clear explanation of the change
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 5,751 | 0 | 5,751 | |
| Total | 5,751 | 0 | 5,751 |
Risk Indicators
VVB-confirmed combined test
finite stove lifetime
Quantified at 4.7% / 1.8%
Project-specific; alignment issues flagged
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →