Qingdao Xiaojianxi Phase II MSW landfill site LFG recovery to power project
#586of 1084 in China#668of 1339 in Verra (VCS)#53of 159 in ACM0001
Audit Analysis
A VCS-registered landfill gas recovery project in China with a confirmed investment-test additionality and a reasonable leakage treatment, but undermined by five material findings, eight open corrective actions, a significant discrepancy between claimed and verified emission reduction figures, and low extraction confidence across the document set. The project's avoidance-based design limits permanence risk, yet the project-specific baseline and unresolved verification gaps leave meaningful uncertainty around the robustness of the credit claims.
Red Flags
- Five material findings in the verification report, including missing no-net-harm assessment, absent stakeholder-communication records, unclarified flare-system emissions, and unverified electricity cross-checks, each generating a corrective action.
- The claimed emission reduction of 95,812 tCO₂e (2024 monitoring report) and the verified figure of 255,258 tCO₂e (2023 monitoring report) cannot be reconciled on a common basis, creating uncertainty about the true credit volume.
- Seven contradictions across documents, including conflicting statements on whether capture is legally required (PDD says yes, monitoring report says no) and whether FPIC was conducted (verification report says yes, earlier monitoring report says no).
- Minimum extraction confidence rated low, indicating at least one key document was poorly readable, which weakens the evidentiary basis for all scores.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 84,814 | 0 | 84,814 | |
| 2020 | 120,677 | 2,050 | 118,627 | |
| 2021 | 139,358 | 132,672 | 6,686 | |
| 2022 | 145,516 | 145,516 | 0 | |
| 2023 | 129,744 | 129,744 | 0 | |
| Total | 620,109 | 409,982 | 210,127 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
Negligible, consistent with LFG combustion
Project-specific, measured; reassessment not yet due
FPIC and grievance present, but no-net-harm and stakeholder gaps flagged
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →