Audit Analysis
The Quanzhou Canhua PET Recycling Project is a VCS-registered avoidance project with VVB-confirmed additionality and no reversal risk, but it carries a project-specific baseline, a 0% leakage deduction with inconsistent justification across documents, and 12 material findings requiring corrective action. The first monitoring period delivered roughly 80% of the pro-rata ex-ante expectation, indicating conservative crediting. Documentation quality is moderate, with several inter-document contradictions and missing transparency elements (FNRB, usage rates, CORSIA status).
Red Flags
- Twelve material findings and eleven corrective actions were raised by the VVB, including an incorrect Qi,y value in Section 7.2 and a missing Intrinsic Viscosity monitoring parameter
- Leakage justification is inconsistent: the monitoring report (2024-09-10) characterises it as 'quantified' while the validation report (2025-01-20) states 'deemed negligible', yet both apply a 0% deduction
- FPIC status contradicts between the PDD (not conducted) and the validation report (conducted), with a CAR requiring the FPIC section to be revised to meet VCS Standard v4.7 Sections 3.18.7–3.18.8
- No FNRB value, usage-rate data, LCA, or end-use tracking is present in the extracted record, limiting the ability to independently verify the emission-factor chain
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 39,375 | 5,713 | 33,662 | |
| Total | 39,375 | 5,713 | 33,662 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, inconsistent justification
Project-specific, no reassessment date
FPIC with CAR, grievance present, benefit-sharing gap
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →