Skip to main content
GSEnergy Efficiency - DomesticIndiaGeneral Methodologyv2.1

Renew Sakhi Improved Cookstove - 2

GS-4264 ↗ · current registry ID: GS12293

#51of 1329 in Industrial#164of 975 in India#136of 1801 in Gold Standard (GS)

6.1/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.0
Documentation
6.5

Audit Analysis

The Renew Sakhi Improved Cookstove project (GS-4264) is a domestic energy-efficiency project in India with a VVB-confirmed combined additionality test, a quantified 5% leakage deduction, and all corrective actions closed. Key gaps include the absence of a stated buffer pool, no verified ERR figure for the 2024 monitoring period, and CORSIA eligibility creating dual-channel risk. Several minor contradictions between documents (leakage justification, reversal events, safeguards) were resolved by privileging the more recent and authoritative verification report.

Red Flags

  • CORSIA eligibility is confirmed while CCP status is not stated, creating potential dual-channel crediting risk
  • Total ERR verified for the 2024 monitoring period is not found in the extracted record, preventing a direct over/under-delivery check
  • Baseline method is project-specific with no reassessment date stated in available documents

Credit Vintages

IssuedRetiredAvailable
2023
100,70165,76834,933
Total100,70165,76834,933

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals reported

Leakage

5% quantified deduction

Baseline

Project-specific; no reassessment date stated

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents