Rwanda Kamonyi District Clean Water Project I
GS-2886 ↗ · current registry ID: GS10897
#157of 1329 in Industrial#12of 139 in Rwanda#285of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard water-heating displacement project in Rwanda with VVB-confirmed additionality and no reversal events, but undermined by a project-specific baseline, absence of a stated buffer pool, and an unusually large set of corrective actions (over 30) that reveal systemic weaknesses in monitoring data quality, sampling design, and reporting consistency. The verified ERR (2,749 tCO₂e) represents roughly 93.5% of the claimed 2,940 tCO₂e for the 2024 monitoring period, indicating modest under-delivery rather than over-crediting.
Red Flags
- Over 30 corrective actions issued by the VVB, spanning sampling design errors, non-accredited water-quality laboratories, inconsistent date formats, incorrect population sizes in random sampling, and multiple SDG reporting inconsistencies — indicating systemic MRV weaknesses
- FNRB value contradiction between the verification report (77) and the monitoring report (0.77), a factor-of-100 discrepancy that could materially affect credit quantities if a unit error is present
- Leakage justification shifted from 'deemed negligible' (Jan 2024) to 'quantified' (Jan 2025) between two verification reports, with the 0% deduction remaining unchanged
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 2,827 | 2,827 | 0 | |
| 2022 | 2,933 | 0 | 2,933 | |
| 2023 | 2,749 | 0 | 2,749 | |
| 2024 | 2,940 | 0 | 2,940 | |
| Total | 11,449 | 2,827 | 8,622 |
Risk Indicators
VVB-confirmed
no reversals
0% with quantified justification
Project-specific; reassessment timing not stated
FPIC, grievance mechanism, benefit sharing documented
CORSIA excluded; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →