Skip to main content
GSEnergy Efficiency - DomesticKenyaGeneral Methodologyv2.1

Safe Water Programme – Kenya - VPA 53

GS-4406 ↗ · current registry ID: GS12255

#985of 1329 in Industrial#122of 157 in Kenya#1414of 1801 in Gold Standard (GS)

4.4/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
5.0
Documentation
4.0

Audit Analysis

The Safe Water Programme in Kenya has a VVB-confirmed investment additionality test and no reported reversal events, but is undermined by an unaddressed leakage justification, a project-specific baseline with no reassessment record, absence of FPIC, and eight corrective actions flagged by the verifier. The verification report itself notes that actual emission reductions are lower than the ex-ante PDD estimates, and several contradictions across documents (ERR figures, FNRB method, crediting period) reduce confidence in the data. Overall, the project shows moderate design quality but significant implementation and documentation gaps.

Red Flags

  • Leakage deduction of 0% with justification recorded as 'not addressed' in the verification report (Sep 2024), while the monitoring report (Sep 2024) claims it was 'deemed negligible' — the higher-priority verification report does not support the claim.
  • Eight corrective actions required by the VVB, including stratified random sampling deficiencies, potential systemic bias in chlorine tablet usage, missing population confirmation letters, and missing SDG 6 indicator in the VPA-DD.
  • Temporal inconsistency: the verification report is dated 21 Sep 2024 yet the stated monitoring period is 1–31 Dec 2024, meaning the report predates the period it purports to verify.
  • FPIC was not conducted (explicitly recorded as false), despite the project serving students and staff at institutions in Kenya.
  • Crediting period discrepancy: the verification report states 2021-01-01 to 2025-12-31 while the PDD states 2023-04-01 to 2028-04-01, creating uncertainty about the valid crediting window.

Credit Vintages

IssuedRetiredAvailable
2023
31,85731,8570
2024
51,5156,44245,073
Total83,37238,29945,073

Risk Indicators

Additionality

Investment test VVB-confirmed

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification not addressed in verification report

Baseline

Project-specific baseline, no reassessment date found

Safeguards

Grievance mechanism and benefit sharing present, but FPIC not conducted

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents