Safe Water Programme – Nigeria – VPA 12
Score Breakdown
Integrity
verified Additionality confirmed by the VVB (verification/monitoring report, Earthood Services Private Limited, monitoring report 2024-07-23).
missing Leakage justification not addressed in the latest monitoring report (2024-07-23) while a 0% leakage deduction is applied; corrective actions remain open (CAR 01, CAR 02).
Transparency
verified Named VVB and recent monitoring report available (Earthood Services Private Limited; monitoring report dated 2024-07-23).
inferred Unreported/unknown items: total emissions claimed vs verified not stated and grid emission factor not provided; extraction confidence is medium which reduces reliability.
Claim Safety
missing Contradictions in FNBR value and method (82.3 and national default in 2024-07-23 vs 0.96 and local field in earlier docs) increase over-crediting risk.
inferred Usage monitoring method and verified usage rates conflict across documents (prefer recent 2024-07-23 value), creating uncertainty about actual usage and avoided emissions.
Documentation
verified Multiple documents referenced (23 documents used, evidence includes monitoring report and validation report).
missing Two corrective actions remain open; some core fields (buffer pool, grid EF, total ERR claimed/verified) are not stated in the extracted record.
Detailed Analysis
Integrity
Additionality was confirmed by the verifier (monitoring/verification report by Earthood Services Private Limited, monitoring report 2024-07-23) and the project uses a project-specific baseline method. However, the monitoring report lists two corrective actions (CAR 01, CAR 02) and the latest monitoring report applies a 0% leakage deduction while explicitly saying leakage is not addressed, which undermines confidence. Baseline reassessment date is not stated in available documents and no buffer pool percentage is recorded, so permanence mitigation is unclear.
Transparency
A named VVB and a recent monitoring report (2024-07-23) are present and 23 documents were used, which supports transparency. Nonetheless, several key public metrics are missing from the extracted record (total emissions claimed vs verified, grid emission factor), and the extraction confidence is medium, reducing trust in the completeness of the record.
Claim Safety
There is a real risk of over-crediting: the fuel non-renewable biomass value and its method contradict earlier reports (2024-07-23 shows FNBR value 82.3 using a national default; earlier reports showed 0.96 and a local-field method). Usage monitoring and verified usage also conflict across documents (two different values reported in monitoring reports). These contradictions force reliance on the most recent monitoring report (2024-07-23) but lower confidence in claims.
Documentation
Documentation is mixed: the project provides multiple evidence documents (including a validation report and monitoring report) and the VVB is named. Extraction confidence is medium, and important items remain unstated (buffer pool percentage, grid emission factor, total ERR claimed/verified). Two corrective actions are outstanding, which reduces the documentation score.
Overall
I privileged values from the most recent monitoring report dated 2024-07-23 for contradictions (usage rate 96.84; FNBR 82.3 with national_default; leakage justification 'not_addressed'; usage monitoring method 'annual_survey'; safeguards mentioned true) because it is the latest and most specific source. Earlier values (dates 2023 and 2022) appear to be superseded or inconsistent formatting (fractions vs percentages). The contradictions and outstanding corrective actions lower data reliability and scores. Given the integrated weights, the project rates mid-level overall (4.8) reflecting confirmed additionality but material gaps in leakage treatment, baseline reassessment, and documentation completeness.
Audit Analysis
The project shows some positives: additionality was confirmed by the VVB and a named monitoring report is available. However, important gaps and internal contradictions (usage rates, fuel non-renewable biomass values/method, leakage justification) plus required corrective actions reduce confidence in integrity and claim safety.
Project Description
Developer: Impact Carbon Type: Energy Efficiency - Domestic Size: Small Scale Crediting period: 2021-01-01 → 2025-12-31 Estimated annual credits: 60000 tCO2e SDGs: Goal 3: Good Health and Well-Being, Goal 6: Clean Water and Sanitation, Goal 7: Affordable and Clean Energy, Goal 13: Climate Action, Goal 8: Decent Work and Economic Growth, Goal 1: No Poverty
Red Flags
- Contradictory key monitoring values across documents (usage rate, FNBR and its method, leakage justification).
- Leakage not properly justified in the latest report despite a 0% leakage deduction; corrective actions remain open (CAR 01, CAR 02).
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 54,621 | 54,621 | 0 | |
| 2022 | 53,572 | 22,470 | 31,102 | |
| 2023 | 46,915 | 0 | 46,915 | |
| 2024 | 40,300 | 0 | 40,300 | |
| Total | 195,408 | 77,091 | 118,317 |
Cosa migliorerebbe questo punteggio
- Resolve and document the outstanding corrective actions and publish a VVB statement confirming closure.
- Provide reconciled, transparent values for FNBR and usage (with methods) and a clear leakage justification or quantified leakage deduction; publish grid EF and total emissions claimed/verified.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed
no buffer stated
leakage not justified
project baseline, reassessment missing
safeguards mentioned, FPIC unclear
CORSIA/CCP status unknown
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- Public_GS11189 VPA 01-30 Nigeria_MP4 ER sheet v4.0 18072024.xlsx
- GS11189 VPA 01-30 Nigeria WPS - MP3 MR v3.0 03102023.docx
- GS11189 VPA 01-30 Nigeria WPS - MP1 MR v5.0 061020222 clean.pdf
- Public_GS11189 VPA 01-30 Nigeria WPS - MP2 ER sheet v3.0 01032023.xlsx
- GS11189 VPA 01-30 Nigeria WPS - MP4 MR v4.0_18072024_Clean.pdf
- Public_GS11189 VPA1-30 Nigeria _MP1 ER sheet v4.0 05082022.xlsx
- +3 more
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →