Safe Water Programme – Nigeria – VPA 17
GS-3296 ↗ · current registry ID: GS11275
#296of 1329 in Industrial#6of 79 in Nigeria#481of 1801 in Gold Standard (GS)
Audit Analysis
The Safe Water Programme in Nigeria is a Gold Standard project replacing water-boiling with safe drinking water supply, with VVB-confirmed additionality via a combined test. However, the project carries moderate risk due to a project-specific baseline, a thin 0% leakage justification, absence of a stated buffer pool, and multiple corrective actions related to sampling bias and operational-day calculations. The ERR figures across monitoring reports reflect different periods rather than true contradictions, but the FNRB discrepancy (96 vs 82.3) warrants attention.
Red Flags
- Leakage deduction of 0% justified only as 'deemed negligible' without quantified analysis, despite realistic risk of households reverting to water boiling or purchasing bottled water
- Multiple corrective actions required regarding sampling methodology, chlorine tablet usage bias, and operational-day calculations across institution types
- FNRB value discrepancy: verification report (Oct 2022) uses 96 while the 2024 monitoring report uses 82.3, a 14% difference that affects ER calculations
- Total ERR verified figure not stated in the extracted record, limiting independent verification of claimed reductions
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 57,218 | 54,045 | 3,173 | |
| 2022 | 49,791 | 38,836 | 10,955 | |
| 2023 | 43,972 | 0 | 43,972 | |
| 2024 | 41,871 | 0 | 41,871 | |
| Total | 192,852 | 92,881 | 99,971 |
Risk Indicators
VVB-confirmed combined test
no reversals reported
0% deduction, 'deemed negligible' only
Project-specific; no reassessment date
Grievance mechanism and benefit sharing present; FPIC not stated; CAR on safeguarding assessment
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →