Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

Safe Water Programme – Nigeria – VPA 26

GS-3305 ↗ · current registry ID: GS11284

#990of 1329 in Industrial#65of 79 in Nigeria#1419of 1801 in Gold Standard (GS)

4.4/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
3.5
Documentation
4.5

Audit Analysis

The Safe Water Programme in Nigeria has a confirmed investment-test additionality and a named VVB, but is undermined by a severe emission-factor contradiction (82.3 vs 0.96 across verification cycles), an unaddressed 0% leakage deduction, the absence of any buffer pool, and 24 outstanding corrective actions. The project-specific baseline and the dramatic shift in the functional net reduction benefit value raise material over-crediting concerns that are not resolved by the verified usage rate exceeding the assumed rate.

Red Flags

  • FNRB value changed from 0.96 (local field, 2023 verification) to 82.3 (national default, 2024 verification) — an approximately 86-fold difference that is unexplained and could indicate a unit error or a fundamental baseline parameter change
  • Leakage deduction is 0% and the verification report (2024-07-25) records the justification as 'not addressed', while the monitoring report (2024-07-23) claims it was 'deemed negligible' — the higher-priority VVB document does not support the negligible claim
  • 24 corrective actions remain open, including sampling-design non-compliance with CDM Appendix 3, unverified treatment-capacity values, and a typographical error referencing the wrong column for a key parameter
  • Baseline is project-specific with no recorded reassessment date, and the baseline method was not independently measured versus modelled

Credit Vintages

IssuedRetiredAvailable
2021
53,85453,8540
2022
50,10049,0991,001
2023
40,099040,099
2024
35,304035,304
Total179,357102,95376,404

Risk Indicators

Additionality

Investment test confirmed by VVB

Permanence

reversal risk unquantified

Leakage

0% deduction, justification 'not addressed' per VVB

Baseline

Project-specific; FNRB contradiction unresolved

Safeguards

Grievance mechanism and benefit sharing present; FPIC not stated

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents