Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

Safe Water Programme – Nigeria - VPA 81

GS-4332 ↗ · current registry ID: GS12397

#278of 1329 in Industrial#4of 79 in Nigeria#455of 1801 in Gold Standard (GS)

5.4/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.0
Documentation
5.5

Audit Analysis

A Gold Standard safe-water/energy-efficiency project in Nigeria at the validation stage, with a VVB-confirmed combined additionality test and a locally measured fNRB, but hampered by six open corrective actions, a thin 0% leakage justification, no buffer pool stated, and FPIC not conducted. No verified emission reductions exist yet, so over-crediting risk cannot be assessed. The project is structurally sound but carries moderate execution and documentation risk.

Red Flags

  • Six corrective actions remain open from the validation report, including clarification of baseline data sources, justification of the fNRB tool version, and an incomplete safeguarding principles assessment.
  • Free, Prior and Informed Consent (FPIC) was not conducted for a community water-supply project in Nigeria, despite the presence of a grievance mechanism and benefit-sharing description.
  • Leakage is set at 0% with only a 'deemed negligible' justification; no quantitative analysis or scenario testing is documented.

Credit Vintages

IssuedRetiredAvailable
2024
31,326031,326
Total31,326031,326

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

low inherent reversal risk

Leakage

0% deduction, thin justification

Baseline

Project-specific, reassessed 2021

Safeguards

Grievance & benefit-sharing present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents