Safe Water Programme – Nigeria - VPA 86
GS-4327 ↗ · current registry ID: GS12402
#816of 1329 in Industrial#50of 79 in Nigeria#1213of 1801 in Gold Standard (GS)
Audit Analysis
The Safe Water Programme in Nigeria is a Gold Standard energy-efficiency project with VVB-confirmed additionality and documented safeguards, but it is undermined by the absence of any verification report, a 0% leakage deduction with contradictory justifications across documents, and a factor-of-100 discrepancy in the FNRB value between the validation report and an unidentified source. The project-specific baseline and self-reported usage monitoring further weaken the evidentiary base, leaving the claimed 290,960 ERR unverified.
Red Flags
- No verification report found in the extracted record; the claimed 290,960 ERR has no verified counterpart to confirm or challenge it.
- FNRB value appears as 82.3 in the validation report (2024-04-12) but as 0.823 in an unidentified document (2024-04-09) — a factor-of-100 discrepancy that strongly suggests a unit error and raises data-reliability concerns.
- Leakage justification is stated as 'quantified' in the PDD (2023-06-29) but as 'deemed negligible' in an unidentified document (2024-04-09), while the actual deduction is 0% — the two characterisations are inconsistent.
- Usage monitoring relies on self-reporting per the PDD, and the assumed 90% usage rate has no verified counterpart in any available document.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 27,601 | 0 | 27,601 | |
| Total | 27,601 | 0 | 27,601 |
Risk Indicators
VVB-confirmed combined test
avoidance project
0% deduction; contradictory justification
Project-specific; reassessed 2021
FPIC, grievance, benefit sharing documented
CORSIA-eligible; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →