Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

Safe Water Programme – Nigeria - VPA 88

GS-4325 ↗ · current registry ID: GS12404

#645of 1329 in Industrial#31of 79 in Nigeria#980of 1801 in Gold Standard (GS)

4.9/ 10
Integrity
5.2
Transparency
4.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

A Gold Standard safe water and cookstove project in Nigeria at the validation stage, with VVB-confirmed additionality but notable gaps in permanence safeguards (no buffer pool stated), a thin leakage justification, and six outstanding corrective actions that must be resolved before credit issuance. The project has not yet entered its crediting period, so no verified emission reductions are available to assess over- or under-delivery.

Red Flags

  • Six corrective actions remain open from the validation report, including justification of the fNRB calculation method and clarification of baseline data sources, indicating the project documentation was not fully robust at validation.
  • FPIC was not conducted, which is a safeguard gap for a community-level safe water programme in Nigeria.
  • Leakage deduction is 0% with only a 'deemed negligible' justification, without quantified analysis of potential diversion of water or cookstove benefits to non-project uses.

Credit Vintages

IssuedRetiredAvailable
2024
28,210028,210
Total28,210028,210

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

reversal risk unquantified

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, reassessed 2021

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents