Integrity
verified Additionality was confirmed by the VVB, and the project uses a quantified leakage deduction of 0% in the verification report.
missing The verification report states that findings were not closed and lists multiple corrective actions, including CAR#03 and CAR#04 for inconsistencies.
Transparency
verified The monitoring period, VVB name, and usage monitoring method are stated, and the project documents include validation, monitoring, PDD, and verification materials.
missing Total ERs claimed and verified are not stated in the extracted record, and the extraction confidence is only medium.
Claim Safety
verified The project is an avoidance activity with a quantified leakage treatment and a high FNRB value reported under a national default method.
missing The project is marked CORSIA-eligible, while CCP status is not stated, and contradictions exist on usage rates and the crediting period.
Documentation
verified Multiple official documents were used, including validation, monitoring, PDD, and verification reports, and safeguards are explicitly mentioned.
missing Several key fields are not stated, the extraction confidence is only medium, and the verification report notes unresolved findings and corrective actions.
Detailed Analysis
Integrity
The verification report confirms additionality was checked by the VVB, which supports the project’s core environmental claim. Leakage is treated with a quantified deduction of 0%, but the report also says findings were not closed and lists several corrective actions, including inconsistencies between baseline survey forms and the SDG calculation sheet. The baseline method is project-specific, and reversal events are not addressed, so permanence and baseline robustness are only moderate.
Transparency
The record identifies the VVB, the monitoring period, and the annual survey method for usage monitoring, which helps traceability. However, total ERs claimed and verified are not stated in the extracted record, and the extraction confidence is only medium because at least one key document was poorly readable. The documentation set is broader than a single report, but the missing quantitative issuance figures limit transparency.
Claim Safety
The project is an avoidance activity with a quantified leakage treatment, which is better than an unaddressed leakage case. Still, the project is marked CORSIA-eligible, while CCP status is not stated, so dual-market claim risk is not fully resolved. The contradictions on usage rates, FNRB presentation, and the crediting period also weaken confidence that the claimed reductions are fully conservative.
Documentation
The evidence base includes validation, monitoring, PDD, and verification documents, and safeguards such as FPIC, a grievance mechanism, and benefit sharing are explicitly mentioned. Even so, several key fields are not stated in available documents, and the verification report records unresolved findings and multiple corrective actions. The medium extraction confidence further suggests that the documentation package is usable but not fully robust.
Overall
I privileged the most recent verification report for leakage treatment, usage rate verification, and the unresolved findings because it is the latest and most specific source. Where contradictions exist, I treated them as reliability issues rather than resolving them in favor of the project: usage rate assumptions differ across documents, leakage justification shifts from deemed negligible to quantified, FNRB is presented differently across reports, and the crediting period is inconsistent. These discrepancies, together with open findings and missing issuance data, keep the project in a mid-range quality band rather than a strong one.
Audit Analysis
The project has some strengths, including VVB-confirmed additionality, a quantified leakage deduction, and documented safeguards such as FPIC and a grievance mechanism. However, the verification report also shows unresolved findings and multiple corrective actions, while several key items are either not stated or inconsistent across documents, which weakens confidence in the claimed credits.
Project Description
The Project will provide safe water to people in District through borehole and chemical disinfection when required. It will decrease the consumption of non renewable biomass for water boiling so as to protect forest ecosystem and reduce related greenhouse gas emissions. In addition, the project will improve water quality and indoor air quality.
Red Flags
- The verification report says findings were not closed and lists several corrective actions, including inconsistencies between baseline survey forms and the SDG calculation sheet.
- There are contradictions on usage rates, leakage treatment, FNRB presentation, and the crediting period, which reduce reliability of the documentation.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 2,959 | 491 | 2,468 | |
| 2022 | 56,548 | 3,677 | 52,871 | |
| 2023 | 58,878 | 0 | 58,878 | |
| 2024 | 32,562 | 0 | 32,562 | |
| Total | 150,947 | 4,168 | 146,779 |
Cosa migliorerebbe questo punteggio
- Publish the verified issuance figures and reconcile all usage-rate, FNRB, leakage, and crediting-period inconsistencies across documents.
- Close all outstanding findings and corrective actions, and provide a clearer, recent reassessment of the baseline and any reversal/permanence treatment.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
reversal risk not addressed
quantified leakage treatment
project baseline, reassessment missing
FPIC and grievance mechanism present
CORSIA-eligible, CCP status unstated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
pdd
- GS10959 VPA07 Safe Water Project in Bangladesh I VPA DD_20211121tc.docx
- GS10959 VPA07 Safe Water Project in Bangladesh I Stakeholder Consultation Report_20211107tc.docx
- Deviation from TPDDTEC for Calculation of Baseline Emissions without Suppressed Demand in Safe Water Supply Project_20201223_GS decision.pdf
- Pdd
- GS10959 VPA05 VPA DD_20220314.pdf
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →