Shandong Yishui Tangwangshan Wind Farm Project
Score Breakdown
Integrity
verified The validation/verification record indicates additionality was assessed using an investment test and confirmed by the VVB.
missing Baseline is project-specific and the timing of any baseline reassessment is not stated in the extracted record; leakage is not addressed despite a 0% deduction in the monitoring report (2022).
Transparency
verified Key MRV elements are present (named VVB Applus+, stated monitoring period 2020-05-05 to 2021-12-31, and both claimed and verified ER figures are available in the monitoring report dated 2022-10-28).
missing Several corrective actions and internal inconsistencies (meters/calibration details requested; start-date inconsistencies) reduce confidence in MRV clarity (monitoring report, 2022-10-28).
Claim Safety
verified The project is explicitly not CORSIA-eligible in the extracted record, reducing aviation-claim channel risk.
missing Contradictory grid emission factors and ER figures across documents increase over-crediting/greenwashing risk (monitoring report 2022 vs validation report 2021).
Documentation
verified A relatively complete document set is referenced (PDD, monitoring report, validation report, issuance) with 26 documents used and high extraction confidence.
missing Multiple corrective actions (including LoAs and start-date clarifications) indicate documentation gaps that required remediation (monitoring report, 2022-10-28).
Detailed Analysis
Integrity
The project applies ACM0002 with a project-specific baseline approach, and additionality is supported via an investment test confirmed by the VVB (validation/verification record). Leakage is recorded as a 0% deduction, but leakage is not addressed/justified in the extracted record (monitoring report, 2022-10-28), which weakens robustness. No material findings are reported, but the presence of multiple corrective actions (including start-date and metering/calibration clarifications) suggests implementation/MRV weaknesses that can affect integrity (monitoring report, 2022-10-28).
Transparency
The monitoring period (2020-05-05 to 2021-12-31), VVB identity (Applus+), and both claimed and verified ER totals are disclosed in the monitoring report dated 2022-10-28, supporting basic transparency. However, the monitoring report lists several corrective actions, including requests to state calibration information for all electricity meters and to resolve start-date inconsistencies, which reduces MRV clarity and comparability. The extracted record also shows conflicting values across documents (e.g., grid emission factor and ER totals), which undermines transparent, consistent reporting.
Claim Safety
The project is marked as not CORSIA-eligible, which lowers the risk of high-impact aviation claims based on these credits (extracted record). Over-crediting risk is elevated by contradictions in key quantification inputs and outputs: the grid emission factor differs between the monitoring report (2022-10-28) and the validation report (2021-05-26), and verified ERs differ sharply across documents. With CCP status not stated in the extracted record, buyers have less assurance about alignment with higher-integrity labels.
Documentation
The extracted record indicates a broad evidence base (PDD, monitoring report, validation report, issuance) and 26 documents used, with high extraction confidence, which supports a solid documentation score. Nonetheless, the monitoring report (2022-10-28) includes multiple corrective actions (including LoA requests and metering/start-date clarifications), implying that key documentation elements were incomplete or inconsistent at audit time. These issues reduce confidence that the documentation is consistently complete across the project lifecycle.
Overall
Key contradictions materially affect confidence. For verified ERs, I privilege the monitoring report value (40,887; 2022-10-28) over the validation report figure (127,933; 2021-05-26) because monitoring/verification outputs are period-specific and typically supersede validation-stage estimates; the discrepancy still warrants a score penalty. For the grid emission factor, I privilege the monitoring report value (0.8405; 2022-10-28) over the validation report value (0.9309; 2021-05-26) because it is tied to the monitored period, but the inconsistency signals quantification risk. For the crediting period, I privilege the more recent monitoring report (2020-05-12 to 2030-05-11; 2022-10-28) over the earlier monitoring report (2010-05-12 to 2020-05-11; 2021-05-18), but the conflict creates eligibility/issuance uncertainty. For safeguards, grievance mechanism, benefit sharing, and FPIC, I privilege the more recent monitoring report (2022-10-28) indicating these are present, while noting the earlier monitoring report (2013-12-26) indicates they were absent; this suggests either retroactive adoption or inconsistent disclosure and reduces confidence.
Audit Analysis
This is a grid-connected wind project under ACM0002 with additionality confirmed by the VVB and no material findings reported in the latest monitoring/verification record. However, multiple cross-document inconsistencies (crediting period, grid emission factor, and verified ERs) and several corrective actions raise reliability and over-crediting risk concerns.
Project Description
The Shandong Yishui Tangwangshan Wind Farm Project is a 20.4MW wind farm in Yishui County, Shandong Province, P.R. China that generates electricity from wind resources. The electricity is sold to North China Power Grid, which reduces GHG emissions and displaces fossil-fuel dominated grid. The project involves installing 24 wind turbines with capacity of 850 kW each.
Red Flags
- Large inconsistency in verified emission reductions between the monitoring report (40,887) and the validation report (127,933), indicating potential misreporting or period/scope mismatch.
- Crediting period is inconsistent across monitoring reports (2010–2020 vs 2020–2030), creating uncertainty about eligibility and the correct issuance window.
- Leakage is recorded as a 0% deduction while leakage is not addressed/justified in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 15,839 | 10,600 | 5,239 | |
| 2011 | 30,264 | 30,264 | 0 | |
| 2012 | 31,473 | 31,473 | 0 | |
| 2013 | 34,305 | 34,305 | 0 | |
| 2014 | 34,519 | 34,519 | 0 | |
| 2015 | 32,810 | 0 | 32,810 | |
| 2016 | 30,401 | 22,848 | 7,553 | |
| 2017 | 30,174 | 30,174 | 0 | |
| 2018 | 27,043 | 27,043 | 0 | |
| 2019 | 28,389 | 28,389 | 0 | |
| 2020 | 11,984 | 11,984 | 0 | |
| Total | 307,201 | 261,599 | 45,602 |
Cosa migliorerebbe questo punteggio
- Provide a clear reconciliation table across documents showing the correct crediting period, monitoring period boundaries, grid emission factor source/year, and how these lead to the final verified ERs for each issuance event.
- Publish/attach complete metering and calibration records for all electricity meters for the monitored period and document the resolution/closure evidence for all corrective actions (including LoAs and start-date clarifications).
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
Investment test confirmed by VVB
Avoidance project; no reversal events reported
0% deduction but leakage not justified
Project-specific baseline; reassessment timing unclear
Safeguards/FPIC reported but inconsistent across years
Not CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →