Skip to main content
VCSEnergy demandIndia Registry: RegisteredAMS-II.C

SHINE - Distribution of LED lightbulbs in India-6

VCS-2700 ↗

#309of 975 in India#366of 1339 in Verra (VCS)#5of 14 in AMS-II.C

5.6/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
6.0
Documentation
5.5

Audit Analysis

The SHINE LED distribution project in India has a solid additionality foundation confirmed by the VVB and a strong verified-to-claimed ERR ratio of 98.5%, but is held back by a project-specific baseline, a significant number of material findings and corrective actions (6 CARs, 4 CLs), and contradictions between the validation and verification reports on monitoring methodology and usage rates. The project is a straightforward energy-demand activity with no reversal risk, but the monitoring frequency concern and baseline specificity introduce moderate uncertainty.

Red Flags

  • The verification report flags that a single monitoring survey was deemed appropriate for a period exceeding two years, despite the methodology requiring annual frequency — a material finding that undermines MRV reliability.
  • The validation report specifies smart-meter monitoring while the verification report records an annual survey, a direct methodological contradiction that raises questions about data integrity.
  • Six corrective actions and four comments for clarification were raised by the VVB, including missing life-test reports for 7W and 12W LEDs and an unclarified source for the 5-hours-per-day operating assumption.
  • The PDD states leakage is 'not applicable' while the monitoring report states it is 'deemed negligible' — an inconsistency in how the project treats a relevant risk category for distributed hardware.

Credit Vintages

IssuedRetiredAvailable
2021
153,967153,9670
2022
384,0960384,096
Total538,063153,967384,096

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Energy demand – no reversal risk

Leakage

0% deduction, 'deemed negligible' vs PDD 'not applicable'

Baseline

Project-specific, reassessment date not stated

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03AMS-II.C- Demand-side energy efficiency activities for specific technologies

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents