Skip to main content
GSavoidanceSierra LeoneVintage 2021, 2022 Registry: Certified & creditingGeneral Methodologyv2.1

Sierra Leone Safe Water Project

GS-1862 ↗ · current registry ID: GS7476

#35of 108 in Water#2of 16 in Sierra Leone#460of 1801 in Gold Standard (GS)

5.4/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
4.0
Documentation
6.0

Audit Analysis

The Sierra Leone Safe Water Project is a Gold Standard-certified avoidance project displacing decentralized thermal energy consumption, with VVB-confirmed additionality and no reversal events. However, significant discrepancies across documents—including a 50% gap in the fuel non-replacement bias factor, a 0% leakage deduction contradicted by the PDD's 5%, and verified emissions reductions roughly 8× the pro-rata ex-ante expectation—raise material over-crediting and data-reliability concerns.

Red Flags

  • Verified ERR of 51,465 is approximately 8× the pro-rata ex-ante expectation of ~6,396 for the 2024 monitoring period (31,980 lifetime ÷ 5-year crediting period), indicating either a major ex-ante underestimation or a monitoring/claiming error
  • Fuel non-replacement bias (fNRB) factor is 0.95 in the monitoring report (national default) but 0.63 in the validation report (local field measurement); the material findings list confirms the fNRB was updated to 63%, yet the higher 0.95 value appears to be used in monitoring, inflating claimed reductions by ~50%
  • Leakage deduction is 0% in the verification report with a 'quantified' justification, but the PDD specifies a 5% deduction and the monitoring report describes leakage as 'deemed negligible'—three inconsistent treatments across documents
  • Twelve contradictions identified across the document set, spanning leakage, fNRB, usage rates, additionality test type, and crediting period dates, undermining confidence in the internal consistency of the project record

Credit Vintages

IssuedRetiredAvailable
2019
2,9102,89416
2020
6,7896,7890
2021
6,9076,722185
2022
6,1082,9983,110
2023
2,4294451,984
Total25,14319,8485,295

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance type, no reversals

Leakage

0% deduction, inconsistent justification

Baseline

Project-specific, fNRB discrepancy

Safeguards

FPIC, grievance, benefit sharing

Double-claim

CORSIA/CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents