Skip to main content
GSEnergy Efficiency - DomesticIndiaGeneral Methodologyv2.1

Smokeless Energy efficient cookstoves distribution in Rural India

GS-4165 ↗ · current registry ID: GS12017

#929of 1329 in Industrial#781of 975 in India#1356of 1801 in Gold Standard (GS)

4.5/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
5.0
Documentation
4.5

Audit Analysis

This Gold Standard cookstove project in rural India has a VVB-verified additionality assessment and a quantified 5% leakage deduction, but is significantly undermined by nine cross-document contradictions, four material findings, and ten corrective action requests that raise serious questions about the reliability of its emission calculations and safeguards documentation. The project delivered roughly 80% of its pro-rata ex-ante expectation for the monitoring period, indicating moderate under-delivery. The FPIC contradiction (PDD claims it was conducted; the verification report states it was not) is a material governance concern.

Red Flags

  • Nine contradictions across documents, including conflicting fNRB values (0.7 vs 70), conflicting fNRB methods (local field vs national default), and conflicting usage monitoring methods (annual survey vs assumed), undermining confidence in the MRV chain
  • Four material findings and ten corrective action requests in the verification report, including ER calculation inconsistencies between the monitoring report, ER sheet, and PDD ex-ante calculation
  • FPIC contradiction: the PDD (Jan 2024) states FPIC was conducted, but the verification report (Nov 2025) records it as not conducted — a fundamental free, prior, and informed consent gap for a project targeting rural communities
  • Verified emissions (29,876 tCO2e) are only ~80% of the pro-rata ex-ante expectation (37,350 tCO2e) for the monitoring period, indicating the project is under-delivering relative to its lifetime claim

Credit Vintages

IssuedRetiredAvailable
2022
17,18917,1890
2023
33,22121,67011,551
2024
31,81731,8170
2025
17,3538,2649,089
Total99,58078,94020,640

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

5% quantified deduction

Baseline

Project-specific, no reassessment date

Safeguards

FPIC unconfirmed; grievance mechanism present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents