A 10-year VCS solar project in Gujarat, India, verified by RINA Services with a jurisdictional baseline and no reversal events. The project significantly under-delivered relative to its ex-ante estimate (approximately 19% of the pro-rata expectation for the elapsed monitoring period), making the credit claims conservative. However, four corrective actions were required, the additionality test type is not specified in the extracted record, and multiple contradictions between documents reduce confidence in data consistency.
Red Flags
- Four corrective actions (CAR 4.1.1, 4.1.2, 4.2.1, 4.3.1) were required in the 2024 verification report, indicating unresolved MRV or reporting deficiencies
- The 2024 verification report records a 0.2% error factor applied to electricity export and import values due to delayed meter calibration, introducing measurement uncertainty
- Contradictory ERR figures across verification reports (53,801 vs 99,202 verified; 53,801 vs 822,120 claimed) create ambiguity about the true lifetime ex-ante estimate and per-period performance
- Baseline method is reported as 'jurisdictional' in the 2024 monitoring report but 'project' in the 2012 validation report, creating uncertainty about the baseline's robustness
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 8,234 | 2,000 | 6,234 | |
| Total | 8,234 | 2,000 | 6,234 |
Risk Indicators
VVB-confirmed but test type not specified
Solar PV – no carbon storage, no reversal events
0% deduction, justified as negligible for grid-connected solar
Jurisdictional per 2024 report, but contradicted by 2012 validation
Grievance mechanism and safeguards present per 2024 report; no FPIC
CORSIA-ineligible confirmed; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →