Taikefeng Composting Project in Gaomi City
#567of 1329 in Industrial#653of 1084 in China#748of 1339 in Verra (VCS)#35of 105 in AMS-III.D
Audit Analysis
The Taikefeng Composting Project is a registered VCS waste-handling project with a VVB-confirmed investment additionality test and a project-specific modeled baseline. However, the verification report records seven corrective action requests and two outstanding corrective actions, the leakage justification is thin (0% deduction, 'deemed negligible'), and several key MRV parameters (FNRB method, usage monitoring, carbon content) are absent from the extracted record. The project delivered roughly 84% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating modest under-delivery.
Red Flags
- Seven corrective action requests and seven clarification requests were raised during verification, with two corrective actions still listed as required (policy assessment in section 3.4.4 and aerobic handling description in section 6.3).
- Leakage deduction is 0% with only a 'deemed negligible' justification and no quantified analysis, which is thin for a project where compost end-use is not independently tracked.
- FNRB method, usage monitoring method, and carbon content testing are all absent from the extracted record, creating gaps in the MRV chain.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 19,791 | 0 | 19,791 | |
| 2021 | 41,297 | 0 | 41,297 | |
| 2022 | 31,603 | 0 | 31,603 | |
| Total | 92,691 | 0 | 92,691 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deduction, thin justification
Project-specific, modeled, not yet due for reassessment
Grievance mechanism present, FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →