Skip to main content
CarbonMeld CarbonMeld Carbon Observatory
Tools
EN
Re-assessment pendingCDMLandfill gasIndiaRegistry: RegisteredAM0025

The TIMARPUR-OKHLA Waste Management Company Pvt Ltd's (TOWMCL) integrated waste to energy project in Delhi

Developer: TIMARPUR-OKHLA Waste Management Company Pvt. Ltd (TOWMCL)

CDM-1254 ↗

#551of 689 in Methane#2230of 2792 in India#4947of 5732 in CDM (UNFCCC)#24of 35 in AM0025

Score from methodology v2.1 (analysis of 24 Sep 2026). Re-assessment under v2.2 pending.

Assessment

CarbonMeld document-based assessment

01020304 Overall 4.1 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Re-assessment pending · v2.1

Analysis

This CDM landfill-gas project in Delhi has a VVB-verified combined additionality test and quantified leakage treatment, but is undermined by a project-specific modeled baseline, 20-plus material findings (calibration delays, FCFi monitoring deviations), 12 corrective actions, and a persistent 50–76% under-delivery against ex-ante estimates. The verified ERR figure is absent from the extracted record, and key transparency fields (FNRB, usage monitoring, CORSIA/CCP status) are not stated, limiting confidence in the data trail.

Red Flags

5 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Unlock the full analysis

On this page: the analysis of 24 Sep 2026, marked “Re-assessment pending”. Per-dimension scores, risk indicators, 5 red flags, score factors, detailed analysis, and 14 registry documents (14 analyzed).

€9+ VAT · 30-day pass · one-time, no auto-renewal

Every rated project, PDF reports, API access, portfolio alerts and per-dimension scores with red-flag details in side-by-side comparisons for 30 days (public-data comparison is free; fair use: 30 projects per day).

Price + VAT · By paying you accept the Terms of Use — digital content, no refunds. How Premium works

Eligibility & market

Transactions in the CDM registry are discontinued as of 31 December 2026 (UNFCCC, checked 6 October 2026). The UNEP-CCC Article 6 Pipeline lists a request to move this activity to the Article 6.4 mechanism of the Paris Agreement. This page keeps the project's record and our analysis.

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    Not published

    This registry does not publish CORSIA eligibility per project.

  • Integrity label (ICVCM CCP)

    No ICVCM information

    No CCP label and no ICVCM decision found for this project's methodology.

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: project sector

  • Paris Agreement (Article 6)

    Not published

    This registry does not publish Article 6 authorizations.

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Credit Vintages

IssuedRetiredAvailable
2015
12,478012,478
2016
246,1800246,180
2018
64,889064,889
2020
133,2730133,273
2021
165,9650165,965
Total622,7850622,785

Methodology versions used

The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.

  1. 2011–2012AM0025 v6.0since replaced by v14.0.0

    monitoring report

    official page · verified on

  2. 2012–2015AM0025 v6.0since replaced by v14.0.0

    monitoring report

    official page · verified on

  3. 2015–2016AM0025 v6.0since replaced by v14.0.0

    monitoring report

    official page · verified on

  4. 2016–2017AM0025 v6.0since replaced by v14.0.0

    monitoring report

    official page · verified on

  5. 2017–2018AM0025 v6.0since replaced by v14.0.0

    monitoring report

    official page · verified on

  6. 2018–2019AM0025 v6.0since replaced by v14.0.0

    monitoring report

    official page · verified on

  7. 2019–2020AM0025 v6.0since replaced by v14.0.0

    monitoring report

    official page · verified on

  8. 2020AM0025 v6.0since replaced by v14.0.0

    monitoring report

    official page · verified on

  • AM0025: Withdrawn (CDM / UNFCCC) · replaced byACM0022 · official page · verified on

A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.

Documents on the registry

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Analysis ProvenanceAM0025

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →