TIST Program in Kenya, VCS 009
#74of 261 in Soil carbon#47of 157 in Kenya#625of 1339 in Verra (VCS)
Audit Analysis
The TIST Kenya program is a long-running (since 2004) smallholder agroforestry project with VVB-verified additionality, a 10% buffer pool, and no reported reversals, but it is undermined by a project-specific baseline, a thin 0% leakage justification, significant operational attrition (824 PAs removed, 149 pending), and delivery of only ~43% of the pro-rata ex-ante expectation for the 2016–2020 monitoring period. The large volume of non-conformances and open findings in the 2024 PRR indicate ongoing quality-control challenges.
Red Flags
- Verified ERR of 132,727 tCO2e is only ~43% of the pro-rata ex-ante expectation (~311,000 tCO2e) for the 3.5-year monitoring period, suggesting the lifetime estimate of 2.64 M tCO2e may be optimistic
- 824 Project Areas removed from the PD and 149 placed in 'Pending' status since the last monitoring period, indicating significant operational attrition
- Harvesting violations noted in specific groves (e.g., 2005KE890, 2006KE213) and 11 PAs had harvest activity in violation of contract during the second verification
- Open findings remain in the Project Review Report dated August 2024, and a FAR was issued for the related Uganda project (Verra 2496) regarding boundary anomalies
- Leakage deduction of 0% is justified only as 'deemed negligible' without a quantified survey or detailed justification in the extracted record
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2004 | 64,921 | 64,921 | 0 | |
| 2012 | 115,398 | 115,398 | 0 | |
| 2015 | 119,453 | 119,453 | 0 | |
| Total | 299,772 | 299,772 | 0 |
Risk Indicators
Combined test, VVB-verified
Buffer present but high PA attrition
0% deduction, thin justification
Project-specific, reassessment not stated
FPIC, grievance mechanism documented
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →