Tond Tenga
#99of 261 in Soil carbon#21of 33 in Burkina Faso#751of 1339 in Verra (VCS)
Audit Analysis
Tond Tenga is a newly registered VCS AFOLU soil-carbon project in Burkina Faso with a verified combined additionality test and a buffer pool of approximately 57,630 credits (~15.6% of claimed ERR). However, the project carries a project-specific baseline, an unresolved leakage deduction percentage, and a significant 10× discrepancy in ERR figures between the PDD and validation report (since corrected). No monitoring data exists yet, and 16 clarification requests plus 10 corrective action requests were raised during validation, all closed.
Red Flags
- 10× discrepancy in total ERR between PDD (3,703,711.64) and validation report (370,481) — identified and corrected, but raises data-reliability concerns
- Leakage justification described as 'quantified' but the actual deduction percentage is not stated in any available document
- 10 Corrective Action Requests and 16 Clarification Requests raised during validation, including missing financial model, unclear allometric equation assessment, and incorrect non-permanence risk score
- No monitoring reports available; total ERR verified is not stated in the extracted record
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Buffer present, no reversals, risk 14.0
Quantified but pct not stated
Project-specific, not yet due for reassessment
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →