UpEnergy-Social and Climate Impact Programme- Cooking Devices VPA-4
GS-2929 ↗ · current registry ID: GS10970
#475of 1329 in Industrial#45of 92 in Malawi#747of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cooking-stove project in Malawi with VVB-confirmed additionality and a strong claimed-to-verified ERR match (99.1%), but undermined by a project-specific baseline, a thin 0% leakage justification, and an unusually high volume of material findings and corrective actions that raise data-quality concerns. The electric cooktop distribution being NIL during the monitoring period despite being in the project design is a notable integrity gap.
Red Flags
- Electric cooktop distribution was NIL during the 2024–25 monitoring period despite being included in the VPA-DD, raising questions about whether the project is delivering as designed.
- 22 material findings and 25 corrective actions were logged in the 2025 verification report, including data mismatches between the monitoring report, ER worksheet, and sales database, indicating systemic MRV data-quality weaknesses.
- Leakage deduction is 0% on the basis of 'deemed negligible' with no quantified analysis, which is a thin justification for a project distributing cooking stoves where displaced charcoal use could shift to other households or locations.
- Crediting period is stated as 2021-11-01 to 2028-02-14 in the monitoring report but 2026-01-01 to 2030-12-31 in the validation report (Dec 2025), an unexplained discrepancy that affects the validity of the ex-ante ERR baseline.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 349 | 317 | 32 | |
| 2022 | 20,889 | 17,375 | 3,514 | |
| 2023 | 58,957 | 0 | 58,957 | |
| 2024 | 60,883 | 0 | 60,883 | |
| 2025 | 5,167 | 0 | 5,167 | |
| Total | 146,245 | 17,692 | 128,553 |
Risk Indicators
VVB-confirmed combined test
low inherent reversal risk for energy efficiency
0% deduction, 'deemed negligible' only
Project-specific, no reassessment date stated
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →