Skip to main content
GSEnergy Efficiency - DomesticMalawiGeneral Methodologyv2.1

UpEnergy-Social and Climate Impact Programme- Cooking Devices VPA-4

GS-2929 ↗ · current registry ID: GS10970

#475of 1329 in Industrial#45of 92 in Malawi#747of 1801 in Gold Standard (GS)

5.1/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
4.0

Audit Analysis

A Gold Standard cooking-stove project in Malawi with VVB-confirmed additionality and a strong claimed-to-verified ERR match (99.1%), but undermined by a project-specific baseline, a thin 0% leakage justification, and an unusually high volume of material findings and corrective actions that raise data-quality concerns. The electric cooktop distribution being NIL during the monitoring period despite being in the project design is a notable integrity gap.

Red Flags

  • Electric cooktop distribution was NIL during the 2024–25 monitoring period despite being included in the VPA-DD, raising questions about whether the project is delivering as designed.
  • 22 material findings and 25 corrective actions were logged in the 2025 verification report, including data mismatches between the monitoring report, ER worksheet, and sales database, indicating systemic MRV data-quality weaknesses.
  • Leakage deduction is 0% on the basis of 'deemed negligible' with no quantified analysis, which is a thin justification for a project distributing cooking stoves where displaced charcoal use could shift to other households or locations.
  • Crediting period is stated as 2021-11-01 to 2028-02-14 in the monitoring report but 2026-01-01 to 2030-12-31 in the validation report (Dec 2025), an unexplained discrepancy that affects the validity of the ex-ante ERR baseline.

Credit Vintages

IssuedRetiredAvailable
2021
34931732
2022
20,88917,3753,514
2023
58,957058,957
2024
60,883060,883
2025
5,16705,167
Total146,24517,692128,553

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

low inherent reversal risk for energy efficiency

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, no reassessment date stated

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-07General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents