Uplifting communities through clean energy in the DRC - VPA 1

GS-4483 ↗ · current registry ID: GS12470

#809of 1329 in Industrial#8of 9 in Congo, the Democratic Republic of the#1205of 1801 in Gold Standard (GS)#35of 72 in AMS-II.I

4.7/ 10
Integrity
4.3
Transparency
5.0
Claim Safety
4.8
Documentation
4.8

Audit Analysis

A Gold Standard LED lighting project in the DRC with verified additionality and in-place safeguards, but undermined by an extensive list of 27 corrective actions, multiple data inconsistencies across monitoring documents, a project-specific baseline, and a 0% leakage deduction supported only by a 'deemed negligible' claim. The verified emissions reduction of 36,903 tCO₂e for the 8-month monitoring period represents roughly 116% of the pro-rata lifetime expectation, which is within a reasonable range, but the data quality issues raise questions about the robustness of the underlying MRV system.

Red Flags

  • 27 corrective actions and 20+ material findings raised by the VVB, including lamp quantity discrepancies, UID inconsistencies, parameter errors, and missing grievance records, indicating significant MRV weaknesses
  • Usage rate assumed is contradicted between documents (3.5 in the monitoring report vs. 1 in the appendix), creating uncertainty about the baseline assumptions underpinning the claims
  • 0% leakage deduction justified only as 'deemed negligible' in the verification report, while the PDD (2023) does not address leakage at all
  • No buffer pool percentage or permanence claim period stated in any available document, leaving reversal risk for the LED devices unquantified
  • Remote audit was conducted under a temporary deviation (DEVRQ-426) due to armed conflict in the DRC, limiting the depth of in-country verification

Credit Vintages

IssuedRetiredAvailable
2023
29,1553,59125,564
2024
30,27149529,776
2025
16,5551,66614,889
Total75,9815,75270,229

Risk Indicators

Additionality

VVB-confirmed

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, weak justification, PDD silent

Baseline

Project-specific, no reassessment date

Safeguards

FPIC, grievance mechanism, benefit sharing present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-07AMS-III.AR – Substituting fossil fuel-based lighting with LED/CFL lighting systems

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents