USA/OTH/undefined/VER/18072025/00009
OG-687a4788
Score Breakdown
Integrity
missing Additionality, baseline approach, leakage treatment, and any reversal/buffer provisions were not found in the extracted record (no documents available)
inferred No contradictions were detected, but this provides little assurance given the absence of underlying evidence
Transparency
missing No VVB name, monitoring period, or verified vs claimed ERR figures were found in the extracted record
missing Registry/public-data completeness cannot be assessed because no evidence documents were captured
Claim Safety
missing CORSIA/CCP status and key over-crediting controls (baseline and leakage justification) were not found in the extracted record
missing With no MRV/verification evidence, claims based on listed credits carry elevated greenwashing and over-crediting risk
Documentation
missing No evidence documents were captured and 0 documents were used in extraction
missing Minimum extraction confidence is low, reducing confidence that the record is complete or accurate
Detailed Analysis
Integrity
No project design, monitoring, or verification documentation was found in the extracted record (0 documents listed/used), so additionality testing, baseline methodology, leakage assessment, and any permanence provisions (e.g., buffer pool or reversal procedures) cannot be evaluated. With these core elements unsubstantiated, integrity must be scored very low despite the absence of flagged discrepancies.
Transparency
Transparency is very limited because the extracted record contains no underlying documents and therefore no information on the VVB, monitoring period, or any comparison of claimed versus verified emission reductions. The minimum extraction confidence is low, further weakening confidence that public-facing MRV information was captured reliably.
Claim Safety
Claim safety is weak because eligibility/status indicators (such as CORSIA eligibility or CCP approval) and the technical bases that reduce over-crediting risk (baseline setting and leakage justification) were not found in the extracted record. Without verification and monitoring evidence, it is not possible to support high-confidence climate claims tied to the listed credits.
Documentation
Documentation quality is extremely poor: no evidence documents were captured and 0 documents were used in extraction. The minimum extraction confidence is low, indicating at least one key source was poorly readable and increasing the likelihood of missing critical details even if documents exist elsewhere.
Overall
There are no contradictions reported, but this is not meaningful given the complete absence of extracted project documentation. The overall score is driven down primarily by evidence gaps and low extraction confidence, which prevent substantiation of additionality, baseline validity, leakage treatment, and MRV/verification quality. Note: per the gate rules, a documentation score below 3.0 would cap transparency after scoring.
Audit Analysis
The extracted record contains no usable project documentation (no PDD, monitoring report, or verification report), and the minimum extraction confidence is low. As a result, additionality, baseline setting, leakage treatment, and MRV quality cannot be substantiated, creating a high risk of over-crediting and weak claim defensibility.
Project Description
Verify on BlockChain USA/OTH/undefined/VER/18072025/00009 Washington, United States Listed Credits - 20000 | Total Credits - 20000 | Fully | Transferable | Others OG Score - 76 $ 6.5 per Credits Bid
Red Flags
- No project documents were available in the extracted record (0 documents used), so core quality checks (additionality, baseline, leakage, permanence) cannot be validated
- Minimum extraction confidence is low, indicating at least one key source was poorly readable and increasing the risk of missing or mis-extracted critical information
Credit Vintages
Nessuna emissione registrata sul registro.
Cosa migliorerebbe questo punteggio
- Provide and link the core VCS documentation set (PDD, monitoring report(s), verification report(s), and issuance/registry records) so additionality, baseline, leakage, and MRV can be independently checked
- Improve document readability/availability (higher-quality scans or text PDFs) and include explicit statements on baseline approach, leakage deduction and justification, VVB identity, monitoring period, and any CORSIA/CCP status
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
No additionality assessment found
Permanence provisions not evidenced
Leakage not evidenced
Baseline method not found
Safeguards not evidenced
CORSIA/CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →