Veolia LFG PTA Manizales and Cúcuta Landfill
#93of 189 in Methane#79of 124 in Colombia#59of 99 in CerCarbono (CC)#86of 159 in ACM0001
Audit Analysis
A landfill gas capture project under the mature ACM0001 methodology with VVB-confirmed additionality, but undermined by material findings (115 omitted records, calibration delays), a contradictory leakage justification, and a significant discrepancy between the monitoring report and issuance ERR figures. The project-specific modeled baseline and absence of a stated buffer pool further weaken the integrity profile.
Red Flags
- Omission of 115 records in the Cúcuta site emission reduction calculation, flagged as a Corrective Action Request in the verification report
- Contradictory leakage justification: the verification report states 'quantified' (2024-02-16) while a same-document entry dated 2024-02-15 states 'deemed negligible', with a 0% deduction applied
- ERR discrepancy: the monitoring report records 55,343 tCO2e while the issuance document records 109,906 tCO2e for the same period, a factor-of-two gap unexplained in the extracted record
- Low extraction confidence across the document set, indicating at least one key document was poorly readable
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 4,756 | 4,756 | 0 | |
| 2021 | 9,760 | 9,760 | 0 | |
| 2022 | 217 | 217 | 0 | |
| 2023 | 762 | 762 | 0 | |
| Total | 15,495 | 15,495 | 0 |
Risk Indicators
VVB-confirmed combined test; capture not legally required
mixed evidence / unresolved risk
0% deduction; justification contradictory (quantified vs deemed negligible)
Project-specific, modeled; no reassessment date stated
Safeguards mentioned but FPIC and grievance mechanism not documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →