VPA 102- GHG Emission Reduction through use of Bondhu Chula (Improved Cook Stoves) in Bangladesh
GS-3793 ↗ · current registry ID: GS11849
#408of 1329 in Industrial#61of 121 in Bangladesh#655of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard cookstove VPA in Bangladesh has a VVB-verified additionality assessment and a quantified 5% leakage deduction, but suffers from the absence of a buffer pool for a project type with inherent reversal risk, a project-specific baseline, and a contradiction on whether FPIC was conducted. Multiple data inconsistencies across documents (ERR figures, usage rates, crediting period, FNRB method) reduce confidence in the overall data reliability, and CCP eligibility introduces dual-channel risk.
Red Flags
- No buffer pool is stated in any available document, leaving the project exposed to reversal risk from stove replacement or abandonment with no credit backstop
- FPIC status is contradictory: the 2024 verification report states it was not conducted, while the 2023 validation report states it was; the more recent verification report is privileged
- CCP status is listed as 'eligible', creating dual-channel (CORSIA + voluntary market) risk without explicit CORSIA eligibility confirmation
- No lifetime ex-ante ERR estimate was found in any document, preventing a reliable pro-rata over/under-delivery check
- Crediting period is inconsistent across documents: 15 years (2021–2036, monitoring report 2024) versus 5 years (2021–2026, validation report 2022)
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 36 | 36 | 0 | |
| 2023 | 68 | 68 | 0 | |
| Total | 104 | 104 | 0 |
Risk Indicators
VVB-verified combined test
reversal risk unaddressed
5% quantified deduction
Project-specific; no reassessment date found
Grievance mechanism present; FPIC not conducted per 2024 report
CCP eligible; CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →