Skip to main content
GSClean Drinking WaterSierra LeoneVintage 2021, 2022, 2023 Registry: Certified & creditingGeneral Methodologyv2.1

VPA 211 Sierra Leone Safe Water

GS-7476 ↗

#74of 108 in Water#12of 16 in Sierra Leone#1117of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A Gold Standard clean drinking water project in Sierra Leone with VVB-confirmed additionality, no reversal events, and confirmed safeguards (FPIC, grievance mechanism, benefit sharing). However, the extracted record is significantly contaminated with material findings and corrective actions referencing cook stoves, kitchen performance tests, and CH4/N2O emission factors that are unrelated to a water project, raising serious data-reliability concerns. Leakage is deducted at 0% with no stated justification, no buffer pool is documented, and the usage-rate cap (95%) creates a discrepancy with the reported verified rate (98.69%).

Red Flags

  • Material findings and corrective actions contain extensive references to cook stoves, kitchen performance tests, CH4/N2O emission factors, and stove efficiency — none of which are relevant to a clean drinking water project — indicating cross-project data contamination in the extracted record
  • Leakage deduction of 0% with justification recorded as 'not addressed' in the 2024 verification report, despite a 2023 verification report having recorded it as 'quantified'
  • Usage rate reported as 98.69% in the verification report but capped at 95% per corrective action CAR-6, creating an inconsistency in the verified figure used for credit calculation
  • FNRB value of 0.95 (national default) appears inapplicable to a clean drinking water project, suggesting template or data-extraction error

Credit Vintages

IssuedRetiredAvailable
2020
6,4206,4200
2021
7,1417,1356
2022
6,6142,2264,388
2023
2,64002,640
Total22,81515,7817,034

Risk Indicators

Additionality

VVB-confirmed common-practice test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification not addressed

Baseline

Project-specific baseline, reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing confirmed

Double-claim

CORSIA and CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-07General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents