Skip to main content
GSEnergy Efficiency - DomesticBangladeshGeneral Methodologyv2.1

VPA 88 - GHG Emission Reduction through use of Bondhu Chula (Improved Cook Stoves) in Bangladesh

GS-3806 ↗ · current registry ID: GS11835

#412of 1329 in Industrial#65of 121 in Bangladesh#659of 1801 in Gold Standard (GS)

5.2/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

This Gold Standard cookstove project in Bangladesh has a verified additionality assessment and a quantified 5% leakage deduction, but lacks a buffer pool, did not conduct FPIC (per the 2024 verification report), and carries a project-specific baseline. The extensive list of corrective actions and multiple cross-document contradictions (particularly on FPIC, FNRB method, and safeguards) reduce confidence in the overall data reliability. The project is CCP-eligible, introducing a dual-channel risk that is not fully mitigated in the available documentation.

Red Flags

  • FPIC status is contradictory: the 2024 verification report states FPIC was not conducted, while the 2023 validation report states it was — the more recent verification report is privileged, indicating a safeguards gap
  • CCP status is 'eligible' while CORSIA eligibility is not stated, creating an unresolved dual-channel risk for the 523,571 tCO₂e credits
  • 20+ corrective actions were required across the verification and validation processes, including unresolved items on stakeholder consultation, grievance mechanism implementation, and double-counting prevention for stove serial numbers
  • The FNRB method is contradictory: the 2024 verification report cites a national default (0.843) while the 2023 validation report cites a local field measurement — the more recent verification report is privileged, but the methodological shift is unexplained

Credit Vintages

IssuedRetiredAvailable
2022
6,1884,7471,441
2023
8,44008,440
Total14,6284,7479,881

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

avoidance-type project

Leakage

5% quantified deduction

Baseline

Project-specific; reassessment timing not stated

Safeguards

Grievance mechanism present; FPIC not conducted per 2024 VR

Double-claim

CCP eligible; CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents