VPA 93 - GHG Emission Reduction through use of Bondhu Chula (Improved Cook Stoves) in Bangladesh
GS-3801 ↗ · current registry ID: GS11840
#231of 1329 in Industrial#39of 121 in Bangladesh#397of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove VPA in Bangladesh with verified additionality and a quantified 5% leakage deduction, but weakened by the absence of a buffer pool over a 15-year crediting period, non-conduct of FPIC, a project-specific baseline, and a substantial list of corrective actions and cross-document contradictions. The verified usage rate (98.3%) exceeding the assumed rate (90%) is a positive conservatism signal, yet the lack of a lifetime ex-ante estimate prevents a meaningful pro-rata delivery check.
Red Flags
- No buffer pool or permanence mechanism stated for a 15-year crediting period on a cookstove project where stove abandonment or replacement is a realistic reversal risk
- FPIC was not conducted per the 2024 verification report, despite the project targeting household users in Bangladesh
- 17+ corrective actions and 5 material findings remain open or recently resolved, indicating significant documentation and process gaps
- The PoA duration of 28 years was challenged against the Gold Standard 20-year maximum and justified only via transition rules (CAR 02)
- No lifetime ex-ante emission reduction estimate is available in the extracted record, preventing a pro-rata over/under-delivery assessment
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 5,354 | 5,354 | 0 | |
| 2023 | 8,438 | 0 | 8,438 | |
| Total | 13,792 | 5,354 | 8,438 |
Risk Indicators
VVB-verified combined test
reversal risk unaddressed
5% quantified deduction
Project-specific; no reassessment date
Grievance mechanism present; FPIC not conducted
CCP-eligible; CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →