VPA 99 - GHG Emission Reduction through use of Bondhu Chula (Improved Cook Stoves) in Bangladesh
GS-3795 ↗ · current registry ID: GS11846
#294of 1329 in Industrial#51of 121 in Bangladesh#477of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard cookstove project in Bangladesh has a verified combined additionality test and a quantified 5% leakage deduction, but is undermined by the absence of a buffer pool over a 15-year crediting period, a project-specific baseline, and a contradictory FPIC record. The extensive list of corrective actions and multiple cross-document contradictions (particularly on FPIC, leakage, and FNRB method) erode confidence in the data chain. Overall, the project is moderately sound but carries meaningful documentation and safeguards gaps.
Red Flags
- FPIC status is directly contradictory: the 2024 verification report states it was not conducted, while the 2023 validation report states it was — a fundamental safeguards gap that cannot be resolved without further evidence.
- The 2024 verification report lists 17+ corrective actions and 5 material findings, including a challenged 28-year PoA duration against the Gold Standard 20-year maximum, indicating the project design documentation has not been fully reconciled.
- Leakage deduction is reported as 5% in the 2024 verification report but as 0.95 in the 2023 monitoring report; the units are ambiguous (percentage vs. factor) and the discrepancy is unexplained.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 4,550 | 4,550 | 0 | |
| 2023 | 8,440 | 0 | 8,440 | |
| Total | 12,990 | 4,550 | 8,440 |
Risk Indicators
Combined test VVB-confirmed
mixed evidence / unresolved risk
5% quantified deduction
Project-specific, no reassessment date
FPIC contradictory, grievance present
CCP eligible, CORSIA not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →