Water and Climate VPA #2 – Madhya Pradesh, India
GS-3553 ↗ · current registry ID: GS11448
#415of 1329 in Industrial#500of 975 in India#662of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard safe drinking water project in Madhya Pradesh has VVB-confirmed additionality and a quantified 5% leakage deduction, but is undermined by 22 outstanding corrective actions, a project transfer due to the original developer's insolvency, and multiple data inconsistencies across documents. The verified emissions reductions (84,542 tCO₂e) represent roughly 93% of the pro-rata expectation for the elapsed monitoring period, indicating reasonable delivery, yet the absence of a documented buffer pool and the project-specific baseline limit confidence in long-term integrity.
Red Flags
- Project transferred from Helioz GMBH to Carbon Impact Capital due to insolvency — continuity and permanence of the project are at risk
- 22 corrective actions remain outstanding, including missing GPS coordinates, missing SDG parameters, unclear IPCC emission factor source, and missing safeguard/grievance documentation in the monitoring report
- No buffer pool percentage is stated in any available document, leaving reversal risk unaddressed for a 5-year crediting period
- Crediting period dates are inconsistent between the PDD (2022-01-01 to 2027-12-31) and the verification report (2022-04-26 to 2027-04-25), flagged as a FAR in the verification report
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 7,098 | 7,098 | 0 | |
| 2023 | 18,757 | 6,207 | 12,550 | |
| Total | 25,855 | 13,305 | 12,550 |
Risk Indicators
VVB-confirmed investment test
project transferred due to insolvency
5% quantified deduction per verification report
Project-specific baseline; no reassessment date stated
FPIC, grievance mechanism, and benefit sharing documented
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →