Wind Based Power Generation By Panama Wind Energy Private Limited In Maharashtra, India
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test, which supports the project’s core crediting claim.
missing Leakage is not addressed in the extracted record, and the verifier raised several corrective actions affecting monitoring quality and accounting.
Transparency
verified The project has a named VVB and a clearly stated monitoring period, with claimed and verified reductions matching in the latest record.
missing The extraction confidence is low and the verification report lists missing calibration certificates, missing generation data for some months, and other documentation gaps.
Claim Safety
verified The project is marked as not CORSIA-eligible, which reduces one channel of dual-claim risk.
missing The baseline is project-specific rather than clearly standardized or recently reassessed, and leakage justification is listed as not addressed.
Documentation
verified A large number of documents were used, and the record includes FPIC, grievance mechanism, and benefit-sharing references.
missing Low extraction confidence plus numerous corrective actions and inconsistent reporting details reduce confidence in the completeness of the documentation set.
Detailed Analysis
Integrity
The project has a positive integrity signal because the VVB confirmed additionality through an investment test, and the record does not show any reversal events. However, leakage is not addressed in the extracted facts, and the verifier issued multiple corrective actions, including missing calibration certificates, missing generation data for September and October 2021, and a request for a no-double-accounting undertaking. Those issues weaken confidence in the robustness of the monitoring and accounting.
Transparency
Transparency is mixed: the project has a named verifier, a defined monitoring period, and the latest record shows claimed and verified reductions both at 94,949 tCO2e. But the extraction confidence is low, and the verification report lists several missing or inconsistent items, including calibration certificates, meter-location details, functional reference links, and local stakeholder consultation records. That lowers confidence in the public-facing completeness of the MRV trail.
Claim Safety
Claim safety is weakened by the unresolved leakage treatment and the project-specific baseline approach, which is less robust than a clearly standardized or recently reassessed baseline. The project is marked as not CORSIA-eligible, which helps reduce dual-channel claim risk, but the record still includes a verifier request for a no-double-accounting undertaking. The contradictory emissions totals also raise over-crediting concerns.
Documentation
The documentation set is broad, with 36 documents used and references to FPIC, grievance mechanisms, benefit sharing, and safeguards. Even so, the extraction confidence is low, and the verifier identified multiple gaps and formatting or content issues, including missing calibration certificates and incomplete stakeholder-consultation records. The crediting period is long and the monitoring period is relatively recent, but the overall record still looks incomplete.
Overall
I privileged the latest higher-value emissions figure of 94,949 tCO2e because it appears in the more recent verification record, while noting that an earlier document reported 66,398 tCO2e; this contradiction materially reduces reliability. I also privileged the more recent positive statements on safeguards, grievance mechanism, benefit sharing, and FPIC, but the older documents show the opposite, so the record is internally inconsistent. Because the documentation is low-confidence and the verifier raised several corrective actions, the project scores only mid-range despite having VVB-confirmed additionality and no reported reversals.
Audit Analysis
This is a registered VCS wind project with VVB-confirmed investment-test additionality and no reported reversal events, but the record shows several documentation and reliability weaknesses. The biggest concerns are unresolved leakage treatment, multiple corrective actions from the verifier, and contradictory emissions-reduction totals across monitoring documents.
Project Description
Project Sky generates renewable energy by using wind turbines to produce electricity, which is then sold to the state grid. The project, which initially aimed to install 100.8 MW by March 2012, has implemented 72 MW (45 WTGs) in different phases and is currently in operation. The wind turbines used in the project are manufactured by General Electric (GE).
Red Flags
- Leakage is not addressed in the extracted record, despite a project type where baseline and monitoring rigor matter.
- The verification record contains multiple corrective actions, including missing calibration certificates, missing generation data, and a no-double-accounting undertaking request.
- Emissions-reduction totals conflict across documents, with 94,949 tCO2e in the latest record versus 66,398 tCO2e in an earlier one.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 127,168 | 127,168 | 0 | |
| 2017 | 124,497 | 98,747 | 25,750 | |
| 2018 | 173,995 | 158,797 | 15,198 | |
| 2019 | 116,745 | 79,102 | 37,643 | |
| 2020 | 107,592 | 53,418 | 54,174 | |
| 2021 | 83,410 | 46,289 | 37,121 | |
| Total | 733,407 | 563,521 | 169,886 |
Cosa migliorerebbe questo punteggio
- Provide a complete, reconciled monitoring package with missing calibration certificates, meter details, generation data, and stakeholder-consultation records.
- Publish a clear leakage assessment and a reconciliation note explaining the emissions-reduction discrepancy between the earlier and later verification records.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Avoidance project with no reversals reported
Leakage not addressed
Project-specific baseline
Safeguards present but inconsistently documented
Not CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →