Wind power project in Maharashtra, India - Andhra Lake Phase - I
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test, which supports the project’s core crediting case.
missing Leakage justification is not addressed in the extracted record, and reversal treatment is also not clearly documented; no buffer pool percentage is stated.
Transparency
verified The verifier is named as EcoLance Private Limited, and the monitoring period for 2024 is clearly stated.
missing The record does not provide claimed ER totals, usage monitoring details, or a clear public-facing MRV trail, and extraction confidence is low.
Claim Safety
verified The methodology is ACM0002 with a recent baseline reassessment in 2023, which is better than an outdated baseline.
missing The verification findings include inconsistencies in ER calculations and billing-cycle dates, which raises over-crediting risk.
Documentation
verified A relatively large number of documents were used, and the record includes a named VVB and a defined monitoring period.
missing Extraction confidence is low, and the verification material contains multiple corrective actions and clarification requests, indicating documentation gaps.
Detailed Analysis
Integrity
The project’s integrity is supported by VVB-confirmed additionality through an investment test, and the baseline was last reassessed in 2023 under ACM0002. However, the extracted record does not clearly document leakage treatment, buffer pool coverage, or reversal handling, which weakens permanence and conservativeness. The verification material also reports multiple corrective actions and clarifications, including missing ER calculation sheets and inconsistencies in reported reductions, which lowers confidence in the crediting case.
Transparency
Transparency is moderate because the verifier, monitoring period, methodology, and verified emissions reductions are stated in the record. At the same time, the claimed emissions reduction total is not found, usage monitoring details are missing, and the extraction confidence is low, suggesting that the documentation is incomplete or difficult to read. The absence of a clear public MRV trail and the presence of several verification findings further limit transparency.
Claim Safety
Claim safety is weakened by the unresolved leakage narrative: one part of the record says leakage is not addressed, while another says it is negligible, so I privilege the later issuance record but still discount confidence because the contradiction is material. The verification findings also mention double counting of billing-cycle dates and inconsistencies between actual and estimated reductions, which increases over-crediting risk. The recent baseline reassessment helps, but it does not fully offset the reliability concerns.
Documentation
Documentation quality is below average because the extraction confidence is low and the record contains numerous corrective actions and clarification requests. The project has many source documents, but key items such as buffer pool coverage, usage monitoring method, and claimed ER totals are not found in the extracted record. The more recent issuance record is more specific on some points, but the contradictions with earlier documents reduce trust in the completeness of the file.
Overall
I privileged the more recent issuance record for conflicting items such as leakage treatment, FPIC, reversal handling, and the crediting period, because it is later and appears to reflect the latest verification state; however, I still penalized the score because the contradictions are material and point to reliability issues. The project is not a clear failure, but the combination of low extraction confidence, multiple CARs/CLs, missing leakage and buffer information, and inconsistent reporting keeps the overall assessment in the mid range. The post-scoring gate on documentation does not bind here, but the integrity score remains well below a strong-credit threshold.
Audit Analysis
This wind project has some positive integrity signals, including VVB-confirmed additionality and a recent baseline reassessment, but the evidence record is weakened by multiple verification findings, unresolved leakage justification, and no buffer pool information. Transparency is only moderate because the monitoring period and verifier are known, yet key claim figures and several MRV details are missing, and the extraction confidence is low.
Project Description
Proponent: Apraava Renewable Energy Private Limited Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: ACM0002 Estimated annual GHG reductions: 82885 tCO2e Region: Asia Registration date: 2020-04-06
Red Flags
- Leakage is stated as not addressed in the extracted record, even though a later document also says leakage is negligible; this inconsistency reduces reliability.
- The verification material reports multiple CARs and CLs, including missing ER calculation sheets and inconsistencies in billing-cycle dates and ER calculations.
- FPIC is recorded as not conducted in the extracted record, despite an earlier document indicating it was true.
- No buffer pool percentage is stated, and reversal treatment is not clearly documented.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 13,654 | 13,654 | 0 | |
| 2012 | 93,508 | 93,508 | 0 | |
| 2013 | 107,180 | 107,180 | 0 | |
| 2014 | 98,421 | 98,421 | 0 | |
| 2015 | 94,927 | 94,927 | 0 | |
| 2016 | 89,554 | 89,554 | 0 | |
| 2017 | 95,087 | 95,087 | 0 | |
| 2018 | 108,712 | 108,712 | 0 | |
| 2020 | 87,221 | 86,974 | 247 | |
| 2021 | 93,220 | 87,182 | 6,038 | |
| 2022 | 94,700 | 29,357 | 65,343 | |
| 2023 | 100,398 | 0 | 100,398 | |
| 2024 | 78,988 | 9,681 | 69,307 | |
| Total | 1,155,570 | 914,237 | 241,333 |
Cosa migliorerebbe questo punteggio
- Provide a complete, reconciled verification package showing the final ER calculation sheet, corrected billing-cycle dates, and a clear explanation of all closed CARs and CLs.
- Document leakage treatment, reversal risk management, buffer pool coverage, and social safeguards more explicitly, including FPIC evidence and a consistent stakeholder communication record.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No buffer pool stated
Leakage treatment inconsistent
Project baseline with recent reassessment
Safeguards mentioned, FPIC not conducted
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →