Xinmi urban domestic waste gas harmless treatment and comprehensive utilization project

VCS-2863 ↗

#362of 1084 in China#435of 1339 in Verra (VCS)#30of 159 in ACM0001

5.5/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
6.0
Documentation
5.0

Audit Analysis

A VCS landfill gas project (ACM0001 v19.0) in China with a VVB-confirmed investment additionality test and measured baseline, but undermined by eight cross-document contradictions—most critically on whether gas capture is legally required and on the grid emission factor. The project delivered roughly 69% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating conservative crediting, yet key MRV parameters (FNRB, usage monitoring) are absent from the extracted record.

Red Flags

  • Contradiction on capture_legally_required: the verification report (Aug 2024) states capture IS legally required, while the monitoring report (Aug 2024) states it is NOT—directly undermining the additionality claim if the VVB's finding is correct
  • Grid emission factor discrepancy: the monitoring report uses 0.57205 tCO2/MWh while the verification report cites 0.8587 tCO2/MWh, a 50% difference that materially affects credit volume
  • FPIC contradiction: the verification report confirms FPIC was conducted, but the PDD (May 2022) records it as not conducted—safeguards compliance is unclear
  • FNRB method and usage monitoring method are not stated in the extracted record, limiting MRV transparency

Credit Vintages

IssuedRetiredAvailable
2021
26,594026,594
2022
87,537087,537
2023
98,428098,428
2024
54,322054,322
Total266,8810266,881

Risk Indicators

Additionality

VVB-confirmed investment test, but legal-requirement contradiction undermines robustness

Permanence

LFG project—gas combusted on-site, no reversal risk; no reversal events reported

Leakage

0% deduction with contradictory justification (quantified vs deemed negligible)

Baseline

Project-specific baseline, measured per VVB; reassessment not yet due (10-yr interval)

Safeguards

Grievance mechanism present; FPIC status contradicted between verification report and PDD

Double-claim

CORSIA eligibility and CCP status both not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents