Yiyang Xiushan Hydropower Project, P.R. China
Score Breakdown
Integrity
verified The validation/verification record indicates additionality was confirmed by the VVB using an investment test.
missing Baseline is project-specific and the timing of any baseline reassessment is not stated in available documents; leakage treatment is inconsistent while using a 0% deduction.
Transparency
verified Key MRV elements are present (methodology ACM0002 v06, grid emission factor stated, monitoring period stated) and no material findings/corrective actions are reported.
missing Contradictory ER totals and conflicting statements on leakage/safeguards reduce confidence in the consistency of public reporting.
Claim Safety
verified The project is explicitly not CORSIA-eligible, reducing certain double-claiming/eligibility-related marketing risks.
missing ER volume contradictions and inconsistent leakage narrative increase perceived over-crediting/greenwashing risk; CCP status is not stated in available documents.
Documentation
verified A relatively complete document set is indicated (PDD, monitoring report, validation report, issuance) with 13 documents used and high extraction confidence.
missing Multiple cross-document contradictions (crediting period, safeguards, leakage, ER totals) indicate documentation quality/control issues despite document availability.
Detailed Analysis
Integrity
Additionality appears reasonably supported because the validation/verification record confirms an investment test and VVB confirmation. The baseline approach is project-specific (per the monitoring/validation documentation using ACM0002), and the extracted record does not state when the baseline was last reassessed, which weakens robustness over a long crediting period. Leakage is applied as a 0% deduction, but the monitoring record is inconsistent on whether leakage was quantified or not addressed, which undermines confidence in the leakage conclusion.
Transparency
The extracted record provides core MRV parameters such as the monitoring period (2012-09-23 to 2017-09-30), the grid emission factor (0.9436) and its reference year (2006), and identifies the VVB (Applus+). No material findings or corrective actions are reported in the extracted verification/monitoring record, which is a positive signal. However, transparency is weakened by major inconsistencies across official documents on ER totals and on whether leakage and safeguards were addressed.
Claim Safety
The project is stated as not CORSIA-eligible, which reduces risks of certain aviation-claims misuse. At the same time, the contradiction in verified ER totals between validation reports (2010 vs 2022) materially increases over-crediting risk perception because it is unclear which figure is authoritative. Leakage is also inconsistently described across monitoring reports while remaining at a 0% deduction, which can be problematic for conservative claims. CCP status is not found in the extracted record, leaving uncertainty for high-integrity claims.
Documentation
Documentation coverage appears relatively strong: the evidence list includes a PDD, monitoring report(s), validation report(s), and issuance records, with 13 documents used and high extraction confidence. The most recent extracted monitoring/validation documents are dated 2022-08-08/2022-08-09, which supports recency. Nonetheless, repeated contradictions across documents (safeguards, grievance mechanism, benefit sharing, FPIC, leakage treatment, crediting period, and ER totals) indicate weak document control and reduce confidence in the record as a whole.
Overall
This project benefits from VVB-confirmed additionality and a standard renewable methodology, but the extracted record contains several material contradictions that reduce confidence. For leakage justification, the 2022 monitoring report says leakage was not addressed while a 2010 monitoring report says it was quantified; I privilege the more recent 2022 statement for current documentation quality, and score down because either way the 0% deduction is not consistently supported. For safeguards/FPIC/grievance/benefit sharing, the 2022 monitoring report indicates these are present while the 2010 monitoring report indicates they are absent; I privilege the more recent 2022 report but still penalize due to inconsistency over time. For verified ERs, the 2022 validation report shows 1,076,341 versus 353,256 in the 2010 validation report; I privilege the more recent 2022 figure but apply a significant penalty because the discrepancy is large and unexplained. For the crediting period, I privilege the explicit 2007-10-01 to 2017-09-30 period stated in the 2022 monitoring report over the older validation report’s incomplete end date, but the inconsistency still reduces reliability.
Audit Analysis
The project has VVB-confirmed additionality (investment test) and uses a standard grid-connected renewable methodology (ACM0002), which supports basic credibility. However, key elements show internal inconsistencies across documents—especially around leakage treatment, safeguards, and the verified ER volume—raising over-crediting and reliability concerns.
Project Description
The Yiyang Xiushan Hydropower Project generates 276,450 MWh of electricity annually and has a total installed capacity of 65MW. The project supplies electricity to the Central China Power Grid via Hunan Provincial Power Grid, with a power density of 10.3W/m2.
Red Flags
- Large discrepancy in verified ERs between validation reports (1,076,341 vs 353,256), creating over-crediting and data reliability risk
- Leakage is inconsistently treated across monitoring reports (described as “quantified” in 2010 but “not addressed” in 2022) while applying a 0% leakage deduction
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 27,677 | 27,677 | 0 | |
| 2008 | 219,059 | 219,059 | 0 | |
| 2009 | 106,520 | 101,224 | 5,296 | |
| 2012 | 28,250 | 28,250 | 0 | |
| Total | 381,506 | 376,210 | 5,296 |
Cosa migliorerebbe questo punteggio
- Provide a clear reconciliation note (from the VVB or registry/issuance documentation) explaining why the verified ER total differs so substantially between the 2010 and 2022 validation reports, including which periods and calculations each figure covers.
- Publish consistent, auditable leakage and safeguards sections across monitoring reports (including explicit leakage assessment under ACM0002 and documented FPIC/grievance evidence) to remove contradictions and support conservative claims.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Avoidance project; no reversal risk indicated
0% deduction with inconsistent justification
Project-specific baseline; reassessment timing unclear
Safeguards/FPIC reported but inconsistent across documents
Not CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →