Skip to main content
VCSWaste handling and disposalChina Registry: RegisteredAMS-II.I

Yizheng Zhongxing Recycled PET Project

VCS-2693 ↗

#701of 1084 in China#823of 1339 in Verra (VCS)#32of 72 in AMS-II.I

4.9/ 10
Integrity
5.0
Transparency
4.8
Claim Safety
5.5
Documentation
4.0

Audit Analysis

The Yizheng Zhongxing Recycled PET Project is a registered VCS waste-handling project with a confirmed investment-test additionality assessment, but it carries a heavy burden of 12 material findings and 10 corrective actions covering coordinate errors, equipment inconsistencies, and methodology deviations. The project delivered only about 59% of its pro-rata ex-ante expectation for the elapsed monitoring period, which is conservative, yet the 0% leakage deduction is supported by contradictory justifications across two versions of the monitoring report. Low extraction confidence and multiple unquantified fields limit the overall reliability of the evidence base.

Red Flags

  • Twelve material findings in the verification report, including geographic coordinate errors, equipment nameplate mismatches after a retrofit, meter serial-number discrepancies, and an unreported methodology deviation on the build-margin emission factor
  • Leakage justification is contradictory: the September 2023 monitoring report describes leakage as 'quantified' while the November 2023 version states it was 'deemed negligible' with a 0% deduction
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, which undermines confidence in the completeness of the extracted record
  • Stakeholder engagement documentation is incomplete: the verification report notes that outcomes of the 15-Mar-2021 stakeholder meeting and the public comment period were not properly accounted for in the PDD

Credit Vintages

IssuedRetiredAvailable
2020
32,78614,62918,157
2021
39,41716,81522,602
2022
29,746029,746
2023
6,798806,718
Total108,74731,52477,223

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, 'deemed negligible' but contradicted by earlie

Baseline

Project-specific baseline; reassessment timing not stated

Safeguards

Grievance mechanism and benefit sharing present, but stakeho

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31AMS-III.AJ

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents