Hebei Huafeng 1×30MW COG Power Generation Project
Developer: Hebei Huafeng Coal Chemistry and Electricity Co., Ltd
Methodology: ACM0012 (CDM)
#2752of 2787 in China#5199of 5269 in CDM (UNFCCC)#77of 82 in ACM0012
Score from methodology v2.1 (analysis of 31 Aug 2026). Re-assessment under v2.2 pending.
Assessment
Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.
Findings
Risk Indicators
🔒
🔒
🔒
🔒
🔒
🔒
Score Breakdown
Score factors per dimension are a Premium feature — Unlock with Premium
Gates applied
The gates applied to this score are a Premium feature — Unlock with Premium
Detailed Analysis
The detailed per-dimension analysis is a Premium feature — Unlock with Premium
Evidence
Eligibility & market
Under decision 4/CMP.20 of the Parties to the Kyoto Protocol (FCCC/KP/CMP/2025/7/Add.1, paragraph 5), the submission of requests for issuance of new CERs was discontinued as of 30 June 2026; requests to transfer CERs to the Article 6.4 mechanism registry, cancellations and any other transactions in the CDM registry are discontinued as of 31 December 2026. This page keeps the project's record and our analysis.
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Not published
This registry does not publish CORSIA eligibility per project.
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: methodology
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
No issuances recorded on the registry.
Methodology versions used
The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.
2011–2012ACM0012 v3.2since replaced by v6.0
monitoring report
official page · verified on
Period not statedACM0012version not stated in the document
monitoring report
- ACM0012: Active (CDM / UNFCCC) · official page · verified on
A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
Profile & governance
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Similar projects
Same methodology or sector, the same registry first.
- Ferrosilicon waste heat power generation projectCDM-5447
- Henan Jiaozuo Yanxin Cement 4.5+7.5MW WHR ProjectCDM-4627
- Power generation by utilizing Blast Furnace Gas at Mukand Limited, Ginigera, KarnatakaCDM-4249
- IFM Integrated Clean Energy ProjectCDM-6669
- Low Temperature Waste Heat Power Generation Project in Zibo Sunnsy Cement Corporation LimitedCDM-4116
- Waste Heat Recovery and Power Generation Project in Yatai Group Harbin Cement Co., Ltd.CDM-4616
- Shuangyang Waste Heat Recovery and Power Generation Project in Jilin Yatai Cement Co., Ltd.CDM-3992
- Inner Mongolia Huanghe Industry and Trade (Group) Wanchen Energy Resources Co., Ltd. Qianfeng Cement Plant 4800 t/d clinker production line #1 technical reconstruction projectCDM-9614
