1.25 MW Wind Power Project at Rajasthan, India
#329of 1935 in Renewable energy#172of 975 in India#205of 1459 in CDM (UNFCCC)#119of 806 in AMS-I.D
Audit Analysis
A standard CDM wind project in Rajasthan using the AMS I.D methodology with a jurisdictional grid baseline and VVB-confirmed investment additionality. The project delivered approximately 77% of its pro-rata expectation for the 2019–2020 monitoring period, consistent with wind variability, but the verified ERR figure is absent from the extracted record. Multiple validation-stage corrective actions (geo-coordinates, debundling, PLF evidence) were raised and resolved, indicating a somewhat rough initial submission.
Red Flags
- Verified ERR figure is not stated in the monitoring report or any extracted document, leaving the VVB's confirmed number unavailable for independent cross-check.
- Validation clarification CL-01 noted a second wind turbine in Dhule, Maharashtra, while the PDD claimed the project was the 'first and only' wind power plant — a debundling concern that was addressed but warrants scrutiny.
- Grid emission factor of 0.922 tCO2/MWh is anchored to 2008 data; no evidence of a more recent grid EF update was found in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 11,363 | 0 | 11,363 | |
| Total | 11,363 | 0 | 11,363 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deemed negligible, physically reasonable
Jurisdictional but grid EF from 2008, no update evidence
Safeguards and benefit sharing mentioned; FPIC and grievance mechanism not stated
CORSIA and CCP status not stated in extracted record
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →