1.25 MW Wind Power Project in Gujarat
#404of 1935 in Renewable energy#203of 975 in India#255of 1459 in CDM (UNFCCC)#141of 806 in AMS-I.D
Audit Analysis
A 1.25 MW wind project in Gujarat registered under CDM with a VVB-confirmed investment additionality test and a jurisdictional grid baseline. The project delivered roughly 62% of its pro-rata ex-ante expectation over the monitoring period, indicating conservative crediting. However, six material findings at validation—including a debundling concern and financial-calculation gaps—along with a baseline-method contradiction between the validation and monitoring reports temper confidence in the underlying data.
Red Flags
- Debundling concern: the validation report flagged an existing registered CDM project by the same participant, requiring justification that the 1.25 MW unit is genuinely additional
- Baseline method contradiction: the validation report (2012) describes a project-specific baseline while the monitoring report (2021) describes a jurisdictional baseline; the two documents are inconsistent
- Six material findings at validation, including incorrect financial-indicator parameters (PLF, tariff, costs) and a missing meter-failure procedure, all requiring corrective action before issuance
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 14,269 | 0 | 14,269 | |
| Total | 14,269 | 0 | 14,269 |
Risk Indicators
VVB-confirmed investment test
Wind avoidance; no reversal events
0% deemed negligible; grid displacement
Jurisdictional but contradicted in validation report
Mentioned; FPIC and grievance mechanism not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →