Skip to main content
CDMWindIndiaAMS-I.D

1.25 MW Wind Power Project in Gujarat

CDM-7160 ↗

#404of 1935 in Renewable energy#203of 975 in India#255of 1459 in CDM (UNFCCC)#141of 806 in AMS-I.D

5.9/ 10
Integrity
6.2
Transparency
5.5
Claim Safety
6.0
Documentation
5.5

Audit Analysis

A 1.25 MW wind project in Gujarat registered under CDM with a VVB-confirmed investment additionality test and a jurisdictional grid baseline. The project delivered roughly 62% of its pro-rata ex-ante expectation over the monitoring period, indicating conservative crediting. However, six material findings at validation—including a debundling concern and financial-calculation gaps—along with a baseline-method contradiction between the validation and monitoring reports temper confidence in the underlying data.

Red Flags

  • Debundling concern: the validation report flagged an existing registered CDM project by the same participant, requiring justification that the 1.25 MW unit is genuinely additional
  • Baseline method contradiction: the validation report (2012) describes a project-specific baseline while the monitoring report (2021) describes a jurisdictional baseline; the two documents are inconsistent
  • Six material findings at validation, including incorrect financial-indicator parameters (PLF, tariff, costs) and a missing meter-failure procedure, all requiring corrective action before issuance

Credit Vintages

IssuedRetiredAvailable
2022
14,269014,269
Total14,269014,269

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind avoidance; no reversal events

Leakage

0% deemed negligible; grid displacement

Baseline

Jurisdictional but contradicted in validation report

Safeguards

Mentioned; FPIC and grievance mechanism not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents