1.5 MW wind power project of Nirmal B. Thakkar H.U.F. at Rajasthan, India

CDM-5531 ↗

#405of 1935 in Renewable energy#204of 975 in India#256of 1459 in CDM (UNFCCC)#142of 806 in AMS-I.D

5.9/ 10
Integrity
7.0
Transparency
4.5
Claim Safety
6.5
Documentation
4.5

Audit Analysis

A 1.5 MW CDM wind project in Rajasthan using the standardised AMS I.D. methodology with a VVB-confirmed investment additionality test and a grid-emission-factor baseline. The project is inherently low-risk on permanence (avoidance-type, no carbon storage), but the absence of any monitoring or verified-emissions data, combined with low extraction confidence and two inter-document contradictions, limits confidence in the overall record.

Red Flags

  • No monitoring report or verified ERR figure found in the extracted record; the 27,800 tCO₂e claim cannot be cross-checked against actual performance
  • Low extraction confidence across the document set, meaning key fields (monitoring period, CORSIA status, CCP status, FPIC, grievance mechanism) are unconfirmed rather than confirmed absent
  • 24 material findings were raised during validation (investment-barrier alternatives, PLF evidence, IRR corrections, depreciation errors, etc.), indicating the initial PDD required substantial correction before VVB sign-off

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, minor doc inconsistency

Baseline

Grid EF baseline, method label contradiction

Safeguards

Mentioned but FPIC/grievance unconfirmed

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents