10 MW Bhavani Barrage-1 Small Hydroelectric Project for a Grid connected system, Tamil Nadu, India

CDM-2415 ↗

#805of 1935 in Renewable energy#402of 975 in India#567of 1459 in CDM (UNFCCC)#271of 806 in AMS-I.D

5.3/ 10
Integrity
6.3
Transparency
4.2
Claim Safety
5.8
Documentation
3.8

Audit Analysis

A 10 MW small hydro project in Tamil Nadu, India, validated under CDM methodology AMS-I.D with a combined additionality test confirmed by TÜV NORD CERT. The project's core claim (displacing grid electricity with renewable hydro) is straightforward and low-risk, but the available record is limited to validation-stage documents from 2009, with no monitoring reports, no verified emission reductions, and low extraction confidence, leaving significant transparency and documentation gaps.

Red Flags

  • No monitoring reports or periodic verification data found in the extracted record; total verified ERR is absent, making it impossible to confirm actual delivery against the 141,400 tCO2e claim
  • Low extraction confidence across the document set, indicating at least one key document was poorly readable or incomplete
  • Eleven Corrective Action Requests and three Clarification Requests were raised during validation, suggesting material documentation deficiencies at the outset (all subsequently closed)
  • A Forward Action Request was placed to review installed equipment and energy meters during the first periodic verification, indicating uncertainty about measurement adequacy at validation time

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, negligible for hydro

Baseline

Project-specific, not jurisdictional

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents