Skip to main content
CDMBiomass EnergyIndiaAMS-I.D

10 MW Biomass based renewable energy generation for the grid, Jalagon District, Maharashtra, India

CDM-2119 ↗

#122of 352 in Biomass#626of 975 in India#915of 1459 in CDM (UNFCCC)#386of 806 in AMS-I.D

4.8/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
5.5
Documentation
3.5

Audit Analysis

A 10 MW biomass-to-grid CDM project in Maharashtra with VVB-confirmed additionality and a reasonable zero-leakage treatment, but hampered by a project-specific baseline, three unresolved corrective actions at validation, and a notable absence of monitoring and verification data in the extracted record. The low extraction confidence and missing post-validation documents limit confidence in the project's ongoing performance.

Red Flags

  • Three corrective actions (Host Country Approval letter, IRR benchmark justification, MPCB statutory clearances) were raised at validation and their resolution is not confirmed in the extracted record
  • No verification or monitoring reports were found in the extracted data despite a 10-year crediting period (2008–2018), leaving the verified ERR and actual performance unconfirmed
  • Feedstock sustainability and carbon content testing are not documented, which is a material gap for a biomass energy project
  • Low extraction confidence across the document set reduces reliability of the available data

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Energy project – low reversal risk

Leakage

0% – negligible for grid displacement

Baseline

Project-specific baseline (VVB)

Safeguards

Safeguards mentioned; FPIC & grievance not documented

Double-claim

CORSIA & CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents