10 MW Biomass based renewable energy generation for the grid, Jalagon District, Maharashtra, India
#122of 352 in Biomass#626of 975 in India#915of 1459 in CDM (UNFCCC)#386of 806 in AMS-I.D
Audit Analysis
A 10 MW biomass-to-grid CDM project in Maharashtra with VVB-confirmed additionality and a reasonable zero-leakage treatment, but hampered by a project-specific baseline, three unresolved corrective actions at validation, and a notable absence of monitoring and verification data in the extracted record. The low extraction confidence and missing post-validation documents limit confidence in the project's ongoing performance.
Red Flags
- Three corrective actions (Host Country Approval letter, IRR benchmark justification, MPCB statutory clearances) were raised at validation and their resolution is not confirmed in the extracted record
- No verification or monitoring reports were found in the extracted data despite a 10-year crediting period (2008–2018), leaving the verified ERR and actual performance unconfirmed
- Feedstock sustainability and carbon content testing are not documented, which is a material gap for a biomass energy project
- Low extraction confidence across the document set reduces reliability of the available data
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Energy project – low reversal risk
0% – negligible for grid displacement
Project-specific baseline (VVB)
Safeguards mentioned; FPIC & grievance not documented
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →